Ceiling Concealed Duct
7. The Coefficient of Capacity Change
Cooling
100
90
80
70
5
Heating
100
90
80
70
5
Notes:
* Equivalent pipe length = Actual pipe length + number of bend x 0.3
* Refer to the specification for the maximum pipe length of each model.
28 _ Inverter
50Hz/R410A
10
15
20
Total pipe length(m)
10
15
20
Total pipe length(m)
30
40
30
40
50
50