— I N S T R U C T I O N G U I D E RGM7000 meter Quickstart guide...
Page 3
— Table of contents Introduction Mechanical installation Electrical installation 07 – 12 Program settings...
Page 4
R G M 7 0 0 0 M E T E R Q U I C K S TA R T G U I D E — Introduction User manual: https://www.electroind.com/ Installation of the RGM7000 meter must be performed only by qualified personnel who follow products/shark-200-power-and-energy-meter/ standard safety precautions during all procedures. Those personnel should have appropriate training and experience with high voltage devices.
Page 5
P R O G R A M S E T T I N G S — Mechanical installation — 01 ANSI installation 96 mm square form — 02 DIN installation DIN mounting ANSI studs brackets 4.0" round form Remove (unscrew) ANSI studs for DIN installation —...
Page 6
WYE with PTs, 3 phase, 4 wire 3 phase, 4 wire Delta direct, Delta with PTs, 3 phase, 3 wire 3 phase, 3 wire Other wiring configurations are available. Refer to the RGM7000 meter user manual (see page 4 for download link).
Page 7
P R O G R A M S E T T I N G S — Program settings 4. Press the DOWN ARROW and then press the ENTER button. You will see the CT numerator setting screen (Ct-n). The current CT numerator is shown on the second line.
Page 8
R G M 7 0 0 0 M E T E R Q U I C K S TA R T G U I D E 7. Press the ENTER button to go to the PT 10. Press the ENTER button to go to the Connection numerator setting screen (Pt-n).
Page 9
IMPORTANT! If you are using the Ethernet option, do not change any settings — leave the protocol **The RGM7000 meter’s Ethernet communication settings are the as Mod rtU.** default settings of Address 1, Baud Rate 57.6 and Protocol Mod rtU.
Page 10
PC very simple. The RGM7000 meter’s RS485 port uses standard 2-wire, half-duplex architecture. Factory initial default settings When the RGM7000 is powered up, for 10 seconds you can connect to the meter using the factory default settings (even if the device profile has been changed).
Page 11
P R O G R A M S E T T I N G S Follow these steps to connect to the meter Program CT, PT ratios via RS485: 1. This is the first device profile screen. To return to 1.
Page 12
R G M 7 0 0 0 M E T E R Q U I C K S TA R T G U I D E Program communications Program meter name 1. Click General Settings>Communications To enter a name/ID for the meter: 1.
Page 14
Any reproduction, to purchase orders, the agreed particulars disclosure to third parties or utilization shall prevail. ABB Inc. does not accept any of its contents – in whole or in parts – is responsibility whatsoever for potential forbidden without prior written consent errors or possible lack of information in of ABB Inc.