Page 1
STEP 2 - Locate two wall studs behind desired operating location of stacked NOTE: For wall studs not appropriately spaced, see section for Alternate STEP 3 STEP 3 - Screw two wall hooks into two wall studs (same height as chain NOTE: 234D2006P002 31-16312 03-13 GE Printed in Canada...
Installation Instructions STEP 4 - STEP 5 - STEP 6 - Hook both chains from upper unit to appropriate STEP 7 - STEP 7 Alternate Method for Installation of Wall Hooks STEP 1 If wall studs are not correctly spaced or centered behind upper STEP 2 NOTE: If wall is concrete or block, drill holes and use appropriate CONNECTING DRYER USING 3-WIRE CONNECTION...
Page 3
Installation Instructions CONNECTING DRYER USING 4-WIRE CONNECTION • Screw Fuse Wire green • ground green ground screw screw here • Green Wire • Strain Screws • Attach ground wire of the power cord with the green • Wire • (white) •...
Page 4
Installation Instructions EXHAUST INFORMATION (continued) TURNS OTHER THAN 90º EXHAUST SYSTEM CHECK LIST HOOD OR WALL CAP SEALING OF JOINTS INSULATION SEPARATION OF TURNS Duct work that runs through an unheated area or is near air conditioning should be insulated to reduce condensation and of straight duct, including distance between last turn and SIDE OR BOTTOM EXHAUST FIXING HOLE...