About this Guide
This guide provides site preparation recommendations, and step-by-step procedures for rack mounting,
installing modules, and connecting to a power source.
After you have completed the hardware installation and power-up of the Z9500, for software
configuration information, refer to the Dell Networking Configuration Guide for the Z9500 Switch and for
Command Line Interface (CLI) information, refer to the Dell Networking Command Line Reference Guide
for the Z9500 Switch.
CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when
handling this equipment.
WARNING: Only trained and qualified personnel can install this equipment. Read this guide
before you install and power up this equipment. This equipment contains two power cords.
Disconnect both power cords before servicing.
WARNING: This equipment contains optical transceivers, which comply with the limits of Class 1
laser radiation.
WARNING: When no cable is connected, visible and invisible laser radiation may be emitted from
the aperture of the optical transceiver ports. Avoid exposure to laser radiation and do not stare
into open apertures.
Related Publications
For more information about the Z9500, refer to the following documents:
•
Dell Networking Configuration Guide for the Z9500 Switch
•
Dell Networking Command Line Reference Guide for the Z9500 Switch
•
Dell Networking Release Notes for the Z9500 Switch
NOTE: For the most recent documentation and software, visit iSupport (registration for access to
some sections is required): http://www.dell.com/support/manuals.
About this Guide
1
5