Sign In
Upload
Manuals
Brands
ABB Manuals
Measuring Instruments
HART FEH300
User Manuals: ABB HART FEH300 Electromagnetic Flowmeter
Manuals and User Guides for ABB HART FEH300 Electromagnetic Flowmeter. We have
1
ABB HART FEH300 Electromagnetic Flowmeter manual available for free PDF download: Commissioning Instruction
ABB HART FEH300 Commissioning Instruction (42 pages)
Electromagnetic Flowmeter
Brand:
ABB
| Category:
Measuring Instruments
| Size: 2.34 MB
Table of Contents
Table of Contents
4
Safety
6
General Safety Information
6
Symbols and Warnings
6
Intended Use
7
Improper Use
7
Technical Limit Values
7
Allowed Fluids
8
Operator Liability
8
Personnel Qualification
8
Transport Safety Information
8
1.10 Installation Safety Information
9
1.11 Electrical Installation Safety Information
9
1.12 Operating Safety Information
9
Transport
10
Inspection
10
Transport of Flanged Units Smaller than DN 450
10
Transport of Flanged Units Larger than DN 400
10
Installation
11
General Information on Installation
11
Supports for Meter Sizes Larger than DN 400
11
Mounting the Measuring Tube
12
Torque Information
13
Flanged Units Processmaster and Hygienicmaster
13
Wafer Type Unit (Hygienicmaster)
15
Variable Process Connections (Hygienicmaster)
15
Information on 3A Conformity
16
Installation Requirements
17
Electrode Axis
17
In- and Outlet Pipe Sections
17
Vertical Connections
17
Horizontal Connections
17
Free Inlet or Outlet
17
Strongly Contaminated Fluids
17
Installation in the Vicinity of Pumps
18
Installing the High Temperature Design
18
Installation in Pipelines with Larger Nominal Diameters
18
Ground
19
General Information on Ground Connections
19
Metal Pipe with Fixed Flanges
19
Metal Pipe with Loose Flanges
20
Non-Metallic Pipes or Pipes with Insulating Liner
20
Sensor Type Hygienicmaster
21
Ground for Devices with Hard Rubber Lining
21
Ground for Devices with Protective Plates
21
Ground with Conductive PTFE Grounding Plate
21
Preparing and Routing the Signal and Magnet Coil Cable
22
Protection Class IP 68
24
Connecting the Transmitter
26
Connecting the Supply Power
26
Transmitter
27
Electrical Connection Diagram
28
Startup Operation
30
Preliminary Checks Prior to Start-Up
30
Operation
30
Menu Navigation
30
Process Display
31
Commissioning the Unit
32
Downloading the System Data
32
Parametrizing Via the "Easy Set-Up" Menu Function
33
Changing to the Information Level
36
Flowmeter Sizes. Flow Range
37
Appendix
38
Additional Documents
38
Permits and Certifications
38
Advertisement
Advertisement
Related Products
ABB HygienicMaster FEH630 series
ABB HygienicMaster FEH632
ABB HygienicMaster FEH631
ABB HygienicMaster FEH612
ABB HygienicMaster FEH610
ABB HygienicMaster FEH611
ABB FEP315
ABB ProcessMaster FEP631
ABB ProcessMaster FEP610
ABB FEV series
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL