Sign In
Upload
Manuals
Brands
ABB Manuals
Power Supply
ProcessMaster 500
ABB ProcessMaster 500 Manuals
Manuals and User Guides for ABB ProcessMaster 500. We have
2
ABB ProcessMaster 500 manuals available for free PDF download: Operating Instructions Manual, Original Instruction
ABB ProcessMaster 500 Operating Instructions Manual (76 pages)
DCS 500 Thyristor Power Converters for DC Drive Systems 25 to 5150 A
Brand:
ABB
| Category:
Power Supply
| Size: 1.34 MB
Table of Contents
Operating Instructions
3
Safety Instructions
5
Table of Contents
8
Chapter 1 - Introduction
11
How to Use this Manual
11
Contents of this Manual
11
Target Group
11
Associated Publications
11
Incoming Inspection
12
Storage and Transport
12
Rating Plate
12
Chapter 2 - Start-Up Instructions
13
General Notes
13
Preparatory Work
17
Scaling Intra-Unit Signals
18
Presetting the Field Supply Unit
20
Adjusting the Current Controller
22
Speed Feedback Balancing
24
Balancing the Field Supply Unit and the E.M.f. Controller
26
Balancing the Speed Controller, Plus Fine-Balancing the E.M.f. and the Current Contr
32
Matching the Thyristor Power Converter Unit to the System Conditions Concerned
33
Presetting the 3-Phase Field Supply Unit DCF 50Xb
34
Chapter 3 - Handling of Control Panel CDP 31X
37
Overview
37
Panel Link
37
Mounting the Panel
37
Start Mode
38
Panel Functions
39
Actual Signal Display Mode
39
Parameter Mode
40
Function Mode
40
Drive Mode
41
Pin/Parameter Selecting and Changing of Value
41
Saving of the Parameters to Backup Memory
43
Fault Resetting (Reset)
44
Emergency Stop Resetting (Reset)
44
Fault History Display
45
Uploading and Downloading of Parameters (UPLOAD/DOWNLOAD)
46
Setting of the Display Contrast
48
Full Name of Output Pins
48
Selecting Output Pins
49
Drive Mode
50
Running the Drive
51
Operational Command Keys
51
Running the DC- Drive from the Cdp31X
51
Speed Reference Setting for the Drive
52
Chapter 4 - Signals and Troubleshooting
53
Display of Status, Alarm and Fault Signals
53
Categories of Signals and Possibilities of Display
53
General Messages
54
Starting Errors (E)
54
Fault Signals (F)
55
Alarm Signals (A)
64
Status Signals
69
Connection Diagram 2
74
Advertisement
ABB ProcessMaster 500 Original Instruction (48 pages)
Electromagnetic Flowmeter
Brand:
ABB
| Category:
Measuring Instruments
| Size: 4.26 MB
Table of Contents
Table of Contents
4
1 Certificates
6
2 Safety
7
Operator Liability
7
Technical Limit Values
7
Safety Information for Electrical Installation
7
Symbols and Warnings
7
3 Device Designs
8
Model with Compact Design
8
DIV. 1
8
DIV. 2
9
Model with Remount Mount Design
9
DIV. 1
10
DIV.2
11
Overview: the Fast Track to the Device Data
12
Name Plate
13
Name Plate for Model with Integral Mount Design (Dual-Compartment Housing)
13
Name Plate for Model with Integral Mount Design (Single-Compartment Housing)
14
Name Plate for Model with Remote Mount Design
15
Name Plate for Transmitter
16
4 Mounting
18
Information about Opening and Closing the Housing
18
Rotating the Transmitter Housing
19
Cable Entries
19
High Temperature Version
20
Protection Class IP 68
20
Information about Using the Device in Areas with Combustible Dust
20
Maximum Allowable Surface Temperature
20
Minimum Signal Cable Length
20
Electrical Connection
21
Process Sealing (Canada)
22
5 Ex Relevant Specifications for Operation in DIV. 1
23
Electrical Connection
23
Flowmeter Sensor and Transmitter in DIV. 1
23
Flowmeter Sensor in DIV. 1 and Transmitter in DIV. 2 or Outside the Hazardous Area
24
Electrical Data for Operation in Zones 1, 21, 22 / DIV. 1
25
Devices with HART Protocol
25
Devices with PROFIBUS PA or FOUNDATION Fieldbus
26
Temperature Data for Operation in Zone 1 / DIV. 1
27
6 Ex Relevant Specifications for Operation in DIV. 2
31
Electrical Connection
31
Flowmeter Sensor and Transmitter in DIV. 2, or Transmitter Outside the Hazardous Area
31
Electrical Data for Operation in Zones 2, 21, 22 / DIV. 2
32
Devices with HART Protocol
32
Devices with PROFIBUS PA or FOUNDATION Fieldbus
32
Temperature Data for Operation in Zone 2 / DIV. 2
32
7 Commissioning
36
Preliminary Checks Prior to Start-Up
36
Notes on Combining the FEP325 Flowmeter Sensor with the FET325 Transmitter or the FEP525 Flowmeter Sensor with the FET525 Transmitter
36
Special Features of the Device Design for Operation in DIV. 1
37
Configuring the Current Output
37
Configuration of the Digital Outputs
37
Changing the Type of Protection
38
8 Maintenance
39
General Information
39
Replacing the Transmitter or Sensor
40
Transmitter
40
Flowmeter Sensor
41
9 Appendix
42
Approvals and Certifications
42
Installation Drawing HART IDM-10-A0258
43
Installation Drawing PROFIBUS PA / FOUNDATION Fieldbus IDM-10-A0266
45
E. County Line Road Warminster, PA
48
Advertisement
Related Products
ABB 500NMD01
ABB 500NMD02
ABB 500NMD11
ABB 500NMD20
ABB 500 Series
ABB 500FSD10
ABB EDS 500FSD20
ABB 500FSD11
ABB 500/2.55
ABB 500/2.3
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL