hit counter script

Unpacking The Server - NEC 1160Xd Installation Procedures Manual

Nec server installation procedures
Table of Contents

Advertisement

!
Clean, dust-free, and well ventilated. Front and rear and top ventilating
openings kept free of obstructions. Away from sources of heat, vibration
or physical shock.
!
Isolated from strong electromagnetic fields and electrical noise produced
by electrical devices (such as air conditioners, large fans, large electric
motors, radio and TV transmitters, and high-frequency security devices)
!
Spacious enough to provide at least 2 feet (0.6 meters) behind the server,
3 feet (1.0 meters) in front of the server and 19.0 inches (0.5 meters) on
each side of the server for proper cooling, airflow, cable clearance and
maintenance.
!
Easily accessible for server maintenance and installation of server
upgrades.

Unpacking the Server

If the packaged server has come from an environment which
is significantly warmer or colder than the environment in
which it is to be installed, leave the server in it's shipping
container for at least 24 hours at room temperature before
removing any packaging. This will prevent damaging
condensation from occurring.
The server weighs approximately 926.0 pounds (420.0Kg). If
the server contains optional equipment, it will weigh more.
To avoid personal injury, make sure you have another
person help you unpack the server and two other persons
help you move the server.
When you receive the server, check to see if the shipping boxes are damaged,
note the damage, and if possible, photograph it for reference. After removing the
contents of the containers, keep the cartons and the packing materials. If the
contents appear damaged when you unpack the boxes, file a damage claim with
the carrier immediately.
The server cabinet is covered with a vinyl shroud for anti-dew-condensation
protection. The packaged cabinet is loaded onto the pallet, outer shipping covers
are attached, and the covers are fastened with plastic straps. The server is
loaded into the shipping container with the front of the server facing the rear of
the container. A ramp for loading and unloading the cabinet is also included in
the shipping container.
4 Express5800/1160Xd/1320Xd Installation Procedures
! CAUTION
!
WARNING

Advertisement

Table of Contents
loading

This manual is also suitable for:

1320xdExpress5800/1160xdExpress5800/1320xd

Table of Contents