hit counter script

Mounting/Installation; Ann-Rly Board Layout And Connection To Facp - Honeywell MRP-2002 Instruction Manual

Agent release control system six-zone releasing fire control panel
Hide thumbs Also See for MRP-2002:
Table of Contents

Advertisement

ANN-BUS Devices

Mounting/Installation

The ANN-RLY relay module can be mounted inside the FACP main circuit board chassis. An
optional ANN-MBRLY mounting bracket allows mounting of the ANN-RLY in the lower right
hand corner of the FACP cabinet instead of or in conjunction with the mounting provisions under
the main FACP circuit board chassis. Refer to the documentation supplied with the module for
information on installation.

ANN-RLY Board Layout and Connection to FACP

Figure 2.25 illustrates the ANN-RLY board showing locations of screw terminals for connection to
the FACP and the DIP switches for selecting the ANN-BUS ID number.
MRP-2002 Series Instruction Manual — P/N 53049:E5 7/28/2016
ANN-BUS (ID#)
Address DIP switch
FACP
-24 VDC
+24 VDC
Figure 2.26 ANN-RLY Board Layout and Connection to FACP
Primary ANN-BUS
Installation
ANN-RLY
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mrp-2002eMrp-2002c

Table of Contents