Figure 8. Two-post center-mount configuration
2
Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws, item 2.
3
Repeat this procedure for the second rail.
Four-post threaded configuration
CAUTION:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
1
For this configuration, remove the latch castings from each end of the ReadyRails assemblies.
To remove the two screws from each flange ear and remove each casting, use a Torx driver, item 1. Retain the castings for future rack
requirements.
20
S4048–ON installation