hit counter script
Huawei SUN2000-3KTL-M0 Quick Manual
Huawei SUN2000-3KTL-M0 Quick Manual

Huawei SUN2000-3KTL-M0 Quick Manual

Hide thumbs Also See for SUN2000-3KTL-M0:

Advertisement

SUN2000-(3KTL-10KTL)-M0
Quick Guide
Issue: 04
Part Number: 31509649
Date: 2019-05-15
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SUN2000-3KTL-M0

  • Page 1 SUN2000-(3KTL-10KTL)-M0 Quick Guide Issue: 04 Part Number: 31509649 Date: 2019-05-15 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 5. Use insulating tools when installing the device. For personal safety, wear proper personal protective equipment (PPE). 6. Huawei shall not be liable for any consequences caused by the violation of the storage, transportation, installation, and operation regulations specified in this document and the user manual.
  • Page 3: Installing The Device

    Installing the Device Installation Requirements Tilt and Space Dimensions...
  • Page 4: Installing The Sun2000

    Installing the SUN2000 When drilling holes, avoid the water pipes and power cables buried in the wall. 1. Install the mounting bracket. • M6x60 expansion bolts are delivered with the SUN2000. If the length and amount of the bolts do not meet installation requirements, prepare M6 stainless steel expansion bolts by yourself. •...
  • Page 5: Electrical Connections

    Electrical Connections Preparing for Installation • Connect cables in accordance with the local installation laws and regulations . • Before connecting cables, ensure that the DC switch on the SUN2000 and all the switches connecting to the SUN2000 are set to OFF position. Otherwise, the high voltage of the SUN2000 may result in electric shocks.
  • Page 6: Installing The Pe Cable

    Installing the PE Cable Do not connect the neutral wire to the enclosure as a PE cable. Otherwise, electric shocks may occur. • The PE point at the AC output port is used only as a PE equipotential point, not a substitute for the PE point on the enclosure.
  • Page 7 1. Connect the AC output power cable to the AC connector. Three-core cable (L1, L2, and L3) Click Four-core cable (L1, L2, L3, and PE) Click Four-core cable (L1, L2, L3, and N) Click...
  • Page 8 Five-core cable (L1, L2, L3, N and PE) Click 2. Connect the AC connector to the AC output port. AC output port (AC) 3. Check the route of the AC output power cable.
  • Page 9: Installing Dc Input Power Cables

    Installing DC Input Power Cables 1. Use the Amphenol Helios H4 PV connectors supplied with the SUN2000. If the PV connectors are lost or damaged, purchase the connectors of the same model. The device damage caused by incompatible PV connectors is not covered under any warranty. 2.
  • Page 10 Positive connector Positive metal terminal Negative Click connector Negative metal terminal Ensure that the cable cannot be pulled out after being crimped. Ensure that the cables are correctly connected. (The DC voltage of a multimeter should Ensure that the locking nut not be less than 1100 V).
  • Page 11 (Optional) Installing the WLAN Smart Dongle NOTE The WLAN Smart Dongle is delivered with the SUN2000. Smart Dongle port (GPRS/4G/WLAN) LED indicator Description Color Status Yellow (blinking green Steady on The Dongle is secured and powered on. and red simultaneously) Blinking at short intervals (on for The parameters for connecting to the 0.2s and then off for 0.2s)
  • Page 12 (Optional) Installing the Signal Cable Communication Port Pin Definition • Not all SUN2000 models are delivered with the signal cable connector. • When laying out the signal cable, separate it from the power cable and keep it away from strong interference sources to avoid strong communication interference.
  • Page 13 NOTE The Smart Power Sensor is necessary for export limitation. Only the DTSU666-H Smart Power Sensor (provided by Huawei) can be used. Multiple Inverter + SmartLogger1000A Networking • A maximum of 80 devices can connect to a single SmartLogger1000A, such as inverters, Smart Power sensor, and EMI.
  • Page 14 (Optional) Installing the RS485 Communications Cable (Inverter Cascading) 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communication port (COM)
  • Page 15 (Optional) Installing the RS485 Communications Cable (Only Smart Power Sensor Connected) 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communication port (COM)
  • Page 16 (Optional) Installing the RS485 Communications Cable (Smart Power Sensor and Energy Storage Device Connected) 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communication port (COM)
  • Page 17 (Optional) Installing the Grid Scheduling Dry Contact Signal Cable 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communication port (COM)
  • Page 18: Verifying Installation

    Verifying Installation Acceptance Criteria The SUN2000 is installed correctly and securely. Cables are routed properly as required by the customer. The Smart Dongle is installed correctly and securely. Cable ties are evenly distributed and no burr exists. The PE cable is connected correctly, securely, and reliably. The DC switch and all the switches connected to the SUN2000 are set to the OFF position.
  • Page 19 Category Status Meaning Communication indicator Communication is in progress. (When a mobile Blinking green at short phone is connected to the SUN2000, the indicator intervals first indicates that the phone is connected to the SUN2000): blinks green at long intervals.) Blinking green at long The mobile phone is connected to the SUN2000.
  • Page 20 2. (Optional) Installer Account Registration NOTE If you have an installer account, skip this step. Creating the first installer account will generate a domain named after the company. To create multiple installer accounts for the same company, log in to the FusionSolar app and tap New User.
  • Page 21 3. Creating a PV Plant and an Account for User For details, see the FusionSolar App Quick Guide. You can scan the QR code to obtain it. Scenario 2: Multiple Inverters + SmartLogger1000A See the SmartLogger1000A Quick Guide. The quick guide is delivered with the SmartLogger1000A. You can scan the QR code to obtain it.
  • Page 22 2. Connect to the inverter WiFi. Log in as installer, and perform Quick settings. • The initial password for connecting the inverter WiFi is Changeme • The initial password of the installer is 00000a • To ensure account security, change the initial password immediately after login.
  • Page 23: Customer Service Contact

    Customer Service Contact Region Country Phone Service Support Email France Germany Spain eu_inverter_support@huawei.com 0080033888888 Europe Italy Netherlands Other countries For details, see solar.huawei.com. Australia au_inverter_support@huawei.com 1800046639 Turkey tr_inverter_support@huawei.com 0080021686868 Malaysia /1800220036 Asia (+66) 26542662 (charged by apsupport@huawei.com Pacific local call)
  • Page 24 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang, Shenzhen 518129, People's Republic of China solar.huawei.com...

Table of Contents