hit counter script
Download Print this page
HP mt40 Product End-Of-Life Disassembly Instructions
HP mt40 Product End-Of-Life Disassembly Instructions

HP mt40 Product End-Of-Life Disassembly Instructions

Mobile thin client

Advertisement

Quick Links

Product End-of-Life Disassembly Instr uctions
Product Category: Notebooks and Tablet PCs
Marketing Name / Model
[List multiple models if applicable.]
HP mt40 mobile thin client
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions
for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU
directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as
applicable.
Item Description
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
Batteries
Mercury-containing components
Liquid Crystal Displays (LCD) with a surface greater
than 100 sq cm
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring
greater than 2.5 cm in diameter or height
External electrical cables and cords
Gas Discharge Lamps
Plastics containing Brominated Flame Retardants
weighing > 25 grams (not including PCBs or PCAs
already listed as a separate item above)
Components and parts containing toner and ink,
including liquids, semi-liquids (gel/paste) and toner
Components and waste containing asbestos
EL-MF877-00
Template Revision B
Notes
With a surface greater than 10 sq cm
All types including standard alkaline and lithium coin
or button style batteries
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Includes background illuminated displays with gas
discharge lamps
Include the cartridges, print heads, tubes, vent
chambers, and service stations.
PSG instructions for this template are available at
EL-MF877-01
Quantity
of items
included
in product
6
2
0
1
0
0
0
0
0
0
0
0
Page 1

Advertisement

loading

Summary of Contents for HP mt40

  • Page 1 Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
  • Page 2 Components, parts and materials containing refractory ceramic fibers Components, parts and materials containing radioactive substances 2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed.
  • Page 3 Standard Operation Procedure 1(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble Battery Step: : : : Before 1. Slide the battery knob to the left, then remove the battery. (Fig.1) Battery knob Fig.1 After Fig.2...
  • Page 4 Standard Operation Procedure 2(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble Cover Step: : : : Before 1. Slide the cover knob to the left, then remove the cover. (Fig.1) Fig.1 After Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 5 Standard Operation Procedure 3(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble HDD Step: : : : Before 1. Loosen HDD set screw * 3. (Fig.1) 2. Remove the HDD. Fig.1 After Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 6 Standard Operation Procedure 4(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Disassemble FAN Ver. : Date Step: : : : Before 1. Loosen FAN set screw * 2, then remove the FAN. (Fig.1) Fig.1 After Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 7 Standard Operation Procedure 5(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Loosen Keyboard Set Screws Step: : : : 1. Loosen keyboard set screw * 3. (Fig.1) Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (#1)
  • Page 8 Standard Operation Procedure 6(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble Keyboard Step: : : : 1. Disassemble the K/B FPC. (Fig.2) 2. Turn the computer over. Fig.1 Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Alicia Chien...
  • Page 9 Standard Operation Procedure 7(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble Thermal Step: : : : Intel DIS 1. Loosen thermal screw *6. 2. Remove the thermal. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (1#)
  • Page 10 Standard Operation Procedure 8(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble CPU Step: : : : Before 1. Disassemble the CPU by slot screwdriver and vacuum pen. Fig.1 After Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Slot screwdriver...
  • Page 11 Standard Operation Procedure 9(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Loosen BTCB Screws Step: : : : 如Fig.1 1. Loosen BTCB screws. * B series - 4 screws. * PW series – 5 screws. Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 12 Standard Operation Procedure 10(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble ODD Step: : : : 1. Loosen ODD set screw * 1. 2. Remove the ODD. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (1#)
  • Page 13 Standard Operation Procedure 11(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Loosen Screws and Pull Out CNTR Step: : : : 1. Loosen the screw (6052B0101901)*2. (Fig.1) 2. Pull out the speaker CNTR. (Fig.2) On the side of ODD Fig.1 Fig.2...
  • Page 14 Standard Operation Procedure 12(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Loosen Hinge Screws Step: : : : 1. Loosen Hinge screw (6052B0155201) * 4. (Fig.1/Fig.2) Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric torx screwdriver (T8)
  • Page 15 Standard Operation Procedure 13(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Loosen BTCB Screws Step: : : : 1. Loosen BTCB screw (6052B0155201) *4. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric torx screwdriver (T8)
  • Page 16 Standard Operation Procedure 14(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Loosen BTCB Screws Step: : : : 1. Loosen BTCB screw (6052B0155201) * 4. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric torx screwdriver (T8)
  • Page 17 Standard Operation Procedure 15(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble BTCB Step: : : : 1. Disassemble the BTCB. 2. Must be sure there is a pad on the north bridge, then attach a release paper to it.
  • Page 18 Standard Operation Procedure 16(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble DDRs Step: : : : 1. Remove all DDRs. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Alicia Chien...
  • Page 19 Standard Operation Procedure 17(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble WLAN Card Step: : : : 1. Loosen WLAN screw (6052A0004501) * 2. 2. Remove the WLAN card. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (#0)
  • Page 20 Standard Operation Procedure 18(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble Hall Sensor/B 圖一 Step: : : : 1. Disassemble Hall Sensor/B. (marked in red circle) 2. Disassemble the cable from routing rib. (marked in white circle) Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 21 Standard Operation Procedure 19(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble CNTRs Step: : : : 1. Pull out LCM CNTR and camera cable CNTR. (Fig.1) 2. Disassemble F/P dummy. Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 22 Standard Operation Procedure 20(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Loosen M/B Screws Step: : : : 1. Loosen M/B screw * 3. (Fig.1) 2. Take out the RTC battery from routing rib. (Fig.2) Fig.1 Fig.2...
  • Page 23 Standard Operation Procedure 21(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Take out the M/B Step: : : : 1. Take out the M/B. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Alicia Chien...
  • Page 24 Standard Operation Procedure 22(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Loosen Screws Step: : : : 1. Disassemble the 4 cables from routing rib. (Fig.1) 2. Loosen screw * 2. (Fig.2/Fig.3) Fig.1 Fig.3 Fig.2...
  • Page 25 Standard Operation Procedure 23(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble Top Case Step: : : : 1. Have the hinge be vertical by wrench. 2. Disassemble the top case. Fig.1 Fig.3 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 26 Standard Operation Procedure 24(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble RJ11 Step: : : : 1. Disassemble RJ11 dummy. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Alicia Chien...
  • Page 27 Standard Operation Procedure 25(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Disassemble Speaker Step: : : : 1. Loosen screw (6052A0004501) * 2.(Fig.2) 2. Disassemble the speaker..Fig.1 Fig.2 DO NOT DO NOT DO NOT...
  • Page 28 Standard Operation Procedure 26(1/1) Document No. : NAIROBI FA DIS ASS’Y SOP Station : 2012/10/30 Name Ver. : Date Inspect BTCB Step: : : : 1. Inspect the BTCB. Check the button. (Fig.1) Check the bracket. (Fig.2) Check the thermal pad. (Fig.3) Fig.1 NO HOT MELT Fig.3...