3. ODU Installation
1. Install mounting kits. (For the board component, go to step 3 after step 1 is completed.)
Installation scenario 1: mounting on a wall
!
"
Recommended: φ8
40 mm to 45 mm
2. Connect the waterproof connector and ODU.
Install components for the waterproof connector
in the sequence shown in the following gure.
Sealing gland base
2.5 N·m
Rubber
#
Rubber bushing
Sealing gland nut
1.8 N·m
Tighten the sealing gland nut to prevent
water from entering the ODU.
4. Connect ODU and PSU and power on the ODU. See step 3 (Connect cables and power on the device) in
part 2 Installation Location Selection.
The ODU must be powered on within 24 hours after unpacking. The ODU must not be powered o for 24 hours or longer during maintenance.
4. (Optional) Con guration
Users can access the WebUI and con gure the device using the following method:
Open a web browser on a PC and enter the IP address in the address bar.
Then, enter the user name and password. The information you need is as follows.
Log In
User name
Password
#
@3
7 N·m
!
!
"
"
Forgot password
Log In
Cancel
Installation scenario 2: mounting on a pole
3. Align mounting kits and rotate the device clockwise
in the lock direction until it fully stops. Determine the
direction of the ODU indicator as required. You can
rotate the ODU counterclockwise to remove it.
192.168.192.1
IP address:
User name: user
Password: LTE@Endusr
t is strongly recommended that you change the default
login password of the WebUI to prevent unauthorized
users from changing the settings.
!
"
M6
#
7 N·m
7 N·m
!
You must hear a
click to complete
installation to
avoid shedding
or damaging the
device.
"