CEILING DUCT TYPE AIR CONDITIONERS INSTALLATION INSTRUCTIONS • Please read this instruction sheet completely before installing the product. • When the power cord is wanted to replace, replacement work shall be performed by authorized personnel only. • Installation work must be performed in accordance with national wiring standards by authorized personnel only.
OUT-LINE OF INSTALLATION 1.The following should be always observed for safety .......3 Installation works Installation Parts Required tools 2. Installation of Indoor, Outdoor unit 1) Selection of the best • • Four Type “A” screws Level location......4 • • Connecting cable Screw driver 2) Indoor unit installation..5 •...
1. The following should be always observed for safety • Please report to or take consent by the supply authority before connecting to the system. • Be sure to read "THE FOLLOWING SHOULD BE ALWAYS OBSERVED FOR SAFETY" before installing the air conditioner. •...
2. Installation of Indoor, Outdoor Unit Inspection hole 1. Selection of the best location Top view (600X600) 1) Indoor unit Control box (unit: mm) Select location Install the air conditioner in the location that satisfies the following conditions. • The place shall easily bear a load exceeding four times the indoor unit’s weight.
2. Indoor unit installation Installation of Unit Install the unit above the ceiling correctly. CASE 1 POSITION OF SUSPENSION BOLT • Apply a joint-canvas between the unit and duct to absorb unnecessary vibration. • Apply a filter Accessory at air return hole. (Unit:mm) Dimension F (G)
Page 6
• Select and mark the position for fixing bolts. • Drill the hole for set anchor on the face of ceiling. • Insert the set anchor and washer onto the suspension bolts for locking the Old building New building suspension bolts on the ceiling. •...
Page 7
CAUTION 1. Install declination of the indoor unit is very important for the drain of the duct type air conditioner. 2. Minimum thickness of the insulation for the connecting pipe shall be 5mm. Front of view • The unit must be horizontal or declined to the drain hose connected when finished installation.
Page 8
• Drill the piping hole with 70mm dia, hole WALL Indoor Outdoor core drill. • Piping hole should be slightly slant to the outdoor side. 5~7mm INSULATION, OTHERS Insulate the joint and tubes completely. THERMAL INSULATION All thermal insulation must comply with local requirement. INDOOR UNIT Union for liquid pipe Thermal insulator for refrigerant pipe...
Page 9
Install the remote control box INSTALLATION OF REMOTE CONTROL BOX and cord correctly. POINT OF REMOTE CONTROLLER INSTALLATION • Although the room temperature sensor is in the indoor unit, the remote control box should be installed in such places away from direct sunlight and high humidity. INSTALLATION OF THE REMOTE CONTROL BOX ROUTING OF THE REMOTE CONTROL CORD •...
Page 10
Perform the work according to the Service REFRIGERANT PIPING Manual or Installation Guide. • Use two spanners when connect the refrigerant pipe to the unit. Flared connection (Union) • Make a bend with a radius as large as possible. • Perform air purge with R-22 or vacuum Use a seemliness tube drying.
Page 11
Perform the electrical wiring work according to ELECTRICAL WIRING the electrical wiring connection. • All wiring must comply with local Circuit Breaker requirements. Main • Select a power source that is capable of power source Switch box supplying the current required by the air conditioner.
3. Connecting Pipes to the Indoor Unit 3-1. Preparation of Piping Copper Main cause of gas leakage is defect in Slanted Uneven Rough tube 90° flaring work. Carry out correct flaring work in the following procedure. 1) Cut the pipes and the cable. Use the accessory piping kit or the pipes purchased locally.
Page 13
6) Pipe bending Annealed copper pipe with small diameter (ø6.35 or ø9.52) can be easily bent manually. In this case, secure large R(radius) for the bend section and gradually bend pipe. If annealed copper pipe is large in diameter (ø15.88 or ø19.05), bend pipe with bender. Use bender appropriate for the pipe diameter.
4. Connecting Pipes to the Outdoor Unit 1) Connecting the pipes to the Outdoor unit 1. Align the center of the pipings and sufficiently tighten the flare nut with fingers. 2. Finally, tighten the flare nut with torque wrench until the wrench clicks. •...
6. Connecting Cables between Indoor Unit and Outdoor Unit 1) Connecting cables to the Indoor Unit Connect the wires to the terminals on the control board individually according to the outdoor unit connection. • Ensure that the color of the wires of outdoor unit and the terminal No. are the same as those of indoor unit respectively (380-415V3N~) (220-240V~)
3) Connecting the cable to the Outdoor Unit 1. Remove the Cover control from the unit Outdoor unit by loosening a screw. Connect the wires to the terminals on Terminal block the control board individually as Cord Clamper following. Power supply 2.
4) Form the pipings 1. Wrap the connecting portion of indoor Seal a small opening unit with the Insulation material and around the pipings secure it with two Plastic Bands. (for the with gum type sealer. right pipings) • If you want to connect an additional drain Drain hose hose, the end of the drain-outlet should Taping...
7. Air Purging of the Connecting Pipes and the Indoor Unit The air which contains moisture remaining in the refrigeration cycle may cause a malfunction on the compressor. 1. Confirm that both the liquid side valve and the gas side valve are set to the closed position. 2.
8. Group Control It operates maximum 16 Units by only one Wired Remote Controller, and each Unit starts sequentially to prevent overcurrent. Main PCB Indoor Unit 1 Indoor Unit 2 Indoor Unit 16 Terminal(Local Supply) Terminal(Local Supply) Terminal(Local Supply) Block Block Block Connector...