hit counter script

Essential Information - ABB HT562420 Operation Manual

Table of Contents

Advertisement

1.5
1.5
NOTICE
NOTICE
© Copyright 2015 ABB. All rights reserved.
Preliminary remarks

Essential information

Essential information
Organisational measures
In addition to this manual, the general, statutory regulations applicable in
the respective country for the prevention of accidents and the protection of
the environment must be observed.
This also applies to the provision and wearing of personnel protection
equipment.
The safety and risk consciousness of the personnel working on and
with the turbocharger must be checked regularly with reference to this
manual.
The turbocharger must be shut down immediately by stopping the
engine in the event of alterations affecting safety or of corresponding
operating behaviour. The fault must be reported to the person or
department responsible.
Additions and alterations to, and conversions of the turbocharger that
could compromise safety require the prior approval of ABB Turbo
Systems.
Operation Manual / TPS44-F.. - TPS61-F..
1
1.5
Page 10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tps48-f32

Table of Contents