hit counter script

Controls System Maintenance; Adjusting The Traction-Control Linkage - Toro 29521 Operator's Manual

30in stand-on aerator
Table of Contents

Advertisement

Figure 58
1. Transmission pulley
2. Transmission
3. Socket (belt-tension
bracket)
3.
Slip the transmission-drive belt of the engine,
tensioner, and transmission pulleys
4.
Route the new transmission-drive belt around
the engine, tensioner, and transmission pulleys
as shown in
Figure 58
5.
Release the belt-tension bracket and allow the
spring to tension the belt
Note:
Make sure that the belt-tension bracket
and pulley can move freely.
g025999
4. Engine pulley
5. Tensioner pulley
(Figure
58).
(Figure
58).
Controls System
Maintenance
Adjusting the
Traction-Control Linkage
1.
Park the machine on a level surface.
2.
Shut off the engine, engage the parking brake,
remove the key, and wait for all moving parts to
stop before leaving the operating position.
3.
Push the control lever all the way forward toward
the front reference bar.
4.
If the control lever contacts the reference
bar or If the gap between the control lever and
reference bar is larger than 1.6 mm (1/16 inch),
perform the following:
A.
Release the control lever and allow it to
return to the neutral position.
B.
Remove the spring-clevis pin from the fork
fitting of the traction-control linkage
59).
1. Spring-clevis pin
2. Locknut
C.
Adjust the fork fitting to set the initial gap
as follows:
If the control lever contacts the
reference bar, rotate the fork fitting
(Figure
from the top of the machine).
If the gap between the control lever and
reference bar is larger than 1.6 mm
(1/16 inch), rotate the fork fitting
59) counterclockwise.
D.
Install the spring clevis pin
move the control lever forward.
50
Figure 59
3. Turnbuckle
59) counterclockwise (as viewed
(Figure
(Figure
g020223
(Figure
59) and

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents