5-17. TG1/8 BASE ASSEMBLY, S BRAKE AND T RATCHET
1. Removing
1. Set the LOADING / L cassette positions. (Refer to pages 5-2 to 5-3)
2. TG1/8 base assembly.
• Removing: 1 → 2 → 3 → 4 → 5 → 6
• Attaching : 5 → 6 → 4 → 3 → 2 → 1
S and T band adjustor
1 Claw
3 Avoid
TG2 arm
assembly
S tension regulator
band assembly
3. S brake and T ratchet.
Hook the spring onto
the
part.
S brake spring
3 PH-Q S brake
2. Attaching
1. Attach the parts in the order of 1 → 3 → 2.
2. Adjust them according to the flowchart (START-2) on page 5-43.
2
TG7 arm
assembly
T tension regulator
band assembly
1
S brake
2
• Removing: 1 → 2 → 3
• Attaching : 3 → 2 → 1
4 Three screws
(M1.4 × 2.5)
PH-Q S breke
5
T ratchet
3 PH-R T ratchet
5-25
PH-Q , PH-R : Page 5-10
6 TG1/8 base assembly
PH-R T ratchet
5
Fixing torque: 0.0686 N•m (0.7 kg•cm)
Hook the spring onto
the
part.
1
T ratchet spring
2