hit counter script

IBM 6C1 Service Manual page 89

Pseries 610
Table of Contents

Advertisement

Step 1540-10
1. Make sure the diagnostic CD-ROM is inserted into the CD-ROM drive.
2. Turn off the power and remove the power cords.
3. Plug the IDE cable into the IDE connector on the system board.
4. Plug in the power cords and wait for the OK on the operator panel display.
5. Turn on the power.
6. After the keyboard indicator is displayed, press the F5 key on the directly attached
keyboard or the number 5 key on an ASCII terminal keyboard.
7. Enter the appropriate password if you are prompted to do so.
Is the "Please define the System Console" screen displayed?
NO
YES
One of the FRUs remaining in the system unit is defective.
In the following order, exchange the FRUs that have not been exchanged:
1. IDE cable
2. CD-ROM drive
3. System board (see notes on page 35)
4. Processor card
5. Power supply.
Repeat this step until the defective FRU is identified or all the FRUs have been
exchanged.
If the symptom did not change and all the FRUs have been exchanged, call
service support for assistance.
If the symptom has changed, check for loose cards, cables, and obvious
problems. If you do not find a problem, return to "Step 1540-1" on page 64 in
this MAP and follow the instructions for the new symptom.
Go to "Step 1540-11" on page 72.
Chapter 3. Maintenance Analysis Procedures (MAPs)
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

6e1

Table of Contents