Sign In
Upload
Manuals
Brands
ABB Manuals
Measuring Instruments
PGC1000
ABB PGC1000 Manuals
Manuals and User Guides for ABB PGC1000. We have
3
ABB PGC1000 manuals available for free PDF download: User Manual, Quick Start Manual
ABB PGC1000 User Manual (408 pages)
Brand:
ABB
| Category:
Measuring Instruments
| Size: 16.13 MB
Table of Contents
Table of Contents
3
Introduction
17
Chapter Descriptions
17
Getting Help
17
Before Calling
17
Key Symbols
18
Safety Practices and Precautions
18
Safety Guidelines
18
Safety First
19
Equipment Markings
19
Grounding the Product
19
Operating Voltage
19
Danger from Loss of Ground
20
Safe Equipment
20
Compliance
20
1 System Description
21
System Overview
21
Framework
21
Calibration
21
Typical Installation
21
Figure 1-1 Typical Single Stream Installation
21
Figure 1-2 Typical Multi-Stream Installation
23
Processing a Sample
24
Hydrocarbons
24
Table 1-1 Hydrocarbons
24
Hardware Systems
25
Standard Hardware Features
25
Table 1-2 System Specifications
25
Recommended Spare Parts
26
Cast Aluminum Enclosure
26
Figure 1-3 Modular Design PGC1000
26
Figure 1-4 PGC1000 Enclosure
27
Figure 1-5 PGC1000 Enclosure Left Side
28
Figure 1-6 PGC1000 Enclosure Right Side
28
Feed-Through Assembly
29
Figure 1-7 PGC1000 Enclosure Bottom View
29
Analytical Module
30
Figure 1-8 PGC1000 Feed-Through Assembly
30
Figure 1-9 Analytical Module
31
Figure 1-10 Manifold Assembly
32
Figure 1-11 Analytical Processor Assembly
33
Figure 1-12 GC Module Assembly
33
Digital Controller Assembly with VGA Display
34
VGA Display (Optional Equipment)
34
Figure 1-13 Digital Controller Assembly with Optional Display
34
Termination Board
36
Grounding the PGC1000
37
Power Supply
37
Figure 1-16 PGC1000 Grounding Considerations
38
Sample Probe
39
Other Considerations
39
Calibration/Validation Stream
39
Operating Voltages and Cable Lengths
40
Table 1-3 12 VDC Battery Power Supply System Maximum Cable Lengths
41
Table 1-4 AC Power Supply System Maximum Cable Lengths
41
Sample Transport Tubing Design
42
Tube Quality
42
Calculation
42
Analysis Time
42
Transit Volume
42
Gas Volume in Transit Tubing
43
Mole
43
Maintaining Phase
43
Table 1-5 Internal Volume of Commonly Used Sample Transport Tubing
43
Heat Tracing Sample Lines
44
Tube Corrosion
44
Tube Preparation
44
Calculating Lag Time
44
Figure 1-17 Heat Tracing Sample Line
44
Calculating Using Actual Pressure
45
Calculations
45
Figure 1-18 Typical Sample Installation Diagram
45
PGC1000 Standard Software Features
46
Audit Quality Data
46
Security System
46
Engineering Units
47
Supported Protocols
47
PCCU Local Communication Options
47
PGC1000 Start-Up Diagnostics
48
Carrier Pressure Regulator Tests
48
Oven Temperature Test
48
Processor Control Test
48
Stream Test
48
Table 1-6 Communication Option Comparison
48
Historical Data
49
Retaining Data
49
Analysis Cycles
49
Stream Averages
49
Diagnostic Reports
49
Audit Logs
49
TCR Sample Probe (Optional Equipment)
50
Location
50
Figure 1-19 Temperature Compensated Regulator with Sample Probe
50
Table 1-7 Optional Temperature Compensated Regulator (TCR)
50
ENC82 Environmental Enclosure (Optional Equipment)
51
Standard Features
51
Figure 1-20 ENC82L Environmental Enclosure with Electric Heater
52
Figure 1-21 ENC82L Environmental Enclosure with Catalytic Heater
52
Figure 1-22 ENC82S Environmental Enclosure with Electric Heater
53
Figure 1-23 ENC82S Environmental Enclosure with Catalytic Heater
53
Optional Features
54
Sample Conditioning Modules (Optional Equipment)
54
Gas Types
54
Mounting Brackets
55
Figure 1-24 Available Sample Conditioning Modules
55
Table 1-8 Sample Conditioning Module Descriptions
55
Figure 1-25 Single and Multiple Stream Sample Conditioning Assemblies
56
Figure 1-26 Single Stream Conditioning Module Dimensions
56
Security Seal (Optional Equipment)
57
Customer Supplied Materials
57
Figure 1-27 Multiple Stream Conditioning Module Dimensions
57
Figure 1-28 PGC1000 End Cap Tabs for Security Seal
57
Instructions
58
Optional Equipment Enclosure (Optional Equipment)
58
6200 Optional Equipment Enclosure
58
Figure 1-29 Security Wire with Seal
58
6800 Optional Equipment Enclosure
59
Power Supply Options (Optional Equipment)
59
12/24 VDC Solar Panel Power Pack
59
115/230 Vac UPS Power Option (24 VDC Systems Only)
60
Figure 1-30 6800 Enclosure with 12/24 VDC Solar Panel Power Pack Option
60
Explosion-Proof Power Supply (Optional Equipment)
61
Figure 1-31 6800 Enclosure with 115/230 Vac UPS Power Option
61
Figure 1-32 Explosion Proof AC Power Supply
62
2 Installation
63
Overview
63
What this Means
63
Organization
63
Locating Area for Installation
64
Figure 2-1 Basic Meter Run Installation
64
Figure 2-2 Typical Wall Shelf Mount Installation
64
Installation
65
Figure 2-3 Sample Probe
65
Table 2-1 Installation Matrix
65
Unpacking and Inspection
66
Shipping Carton
66
Unpacking
67
Bill of Lading
67
Inspection
67
Damaged Components
67
Sample Probe Installation
67
Materials
68
Instructions
68
Stand-Alone Installation
69
Materials Not Supplied
69
Instructions
69
Large Free-Standing Environmental Enclosure Installation
69
Figure 2-4 Sample Probe Insertion
69
Instructions
70
Materials
70
Small Free-Standing Environmental Enclosure Installation
71
Figure 2-5 ENC82L-Enclosure Stand Installation
71
Figure 2-6 ENC82L-Enclosure Mounting Hardware
71
Figure 2-7 ENC82S-Enclosure Installation
72
Instructions
72
Materials
72
Large Pipe-Mounted Environmental Enclosure Mounting Kit
73
Materials
73
Figure 2-8 ENC82S-Enclosure Mounting Hardware
73
Optional Support Leg Kit
73
Figure 2-9 ENC82L-Mounting Brackets
74
Figure 2-10 ENC82L-Mounting Hardware Installation
75
Figure 2-11 ENC82L-Adjustment Assembly
75
Instructions
76
Optional Support Leg Kit Installation
76
Materials
76
Figure 2-12 ENC82L-Pipe Mount Installation
76
Figure 2-13 ENC82L-Chain Retainer Lock
76
Small Pipe-Mounted Environmental Enclosure Mounting Kit
77
Materials
77
Instructions
77
Figure 2-14 ENC82L-Optional Support Leg Overview
77
Figure 2-15 ENC82S-Channel Tubing Installation
78
Figure 2-16 ENC82S-Pipe-Mount Split Brackets
79
Figure 2-17 ENC82S- Pipe-Mount Assembly
79
Pipe Saddle Installation
80
Materials Not Supplied
80
Instructions
80
Figure 2-18 ENC82S-Pipe-Mounted
80
Shelf Installation
81
Materials
81
Instructions
81
Figure 2-19 Typical Pipe Saddle Installation
81
PGC1000 Installation
82
Materials
82
Instructions
82
Figure 2-20 Shelf Installation
82
Figure 2-21 PGC1000 Mounting
83
Figure 2-22 PGC1000 Optional Mounting Flange Pipe
83
Sample Conditioning Module Installation
84
Materials
84
Mounting Kits
84
Instructions
84
Figure 2-23 Sample System Mounting Kits
84
Sample Line Connections
85
Figure 2-24 Single and Multiple Stream Sample Conditioning Assemblies
85
Instructions
86
Materials
86
Figure 2-25 Sample Conditioning Module Line Installation
87
Sample Line(S) to PGC1000 Inside of ENC82
88
Materials
88
Instructions
88
Figure 2-26 ENC82L-Environmental Enclosure Sample Boot
89
Figure 2-27 ENC82S-Environmental Enclosure Sample Boot
89
ENC82L Optional Pwr/Comm Outlet Box Assembly
90
Materials
91
Customer Supplied Materials
91
Instructions
91
Figure 2-28 Power Communication Outlet Box Assembly
92
Figure 2-29 ENC82L Large Enclosure
93
Figure 2-30 Assembled Power/Communication Assembly
94
Figure 2-31 Power Wiring Diagram
95
Figure 1-15 Termination Board
96
Figure 2-32 Suggested RS-232 Wiring Instructions
96
Figure 2-33 Suggested RS-485 Wiring Instructions
97
Figure 2-34 Suggested RS-422 Wiring Instructions
97
Carrier/Calibration Bottle Rack Installation on a Process Line
98
Instructions
98
ENC82 Carrier Gas Bottle Rack Installation
98
Figure 2-35 Carrier/Calibration Gas Bottle Rack Installation
98
Figure 2-36 Dual Bottle Rack Assembly
99
Instructions
99
Materials
99
Carrier Gas Regulator Installation
100
Materials
100
Figure 2-37 ENC82L-Dual Bottle Rack Installation
100
Figure 2-38 ENC82S-Dual Bottle Rack Installation
100
Instructions
101
Figure 2-39 Carrier Gas Pressure Regulator with Relief Valve
101
ENC82L Calibration Gas Bottle Installation
102
Materials
102
Instructions
102
Figure 2-40 Carrier Gas Low Pressure Switch Wiring Instructions
102
ENC82S Calibration Gas Bottle Installation
103
Materials
103
Instructions
103
Figure 2-41 Calibration Bottle Location
103
Calibration Gas Regulator Installation
104
Materials
104
Instructions
104
Figure 2-42 Calibration Bottle Location
104
Carrier Gas and Calibration Gas Connections
105
Figure 2-43 Calibration Gas Pressure Regulator with Relief Valve
105
Figure 2-44 Calibration Blend Low Pressure Switch Wiring Instruction
105
Figure 2-45 Carrier and Calibration Gas Connections
106
Instructions
106
Materials
106
Vent Line Connections
107
Materials
108
Instructions
108
Figure 2-46 Vent Line Connections on Feed-Through Assembly
108
ENC82L Optional Catalytic Heater Installation
109
Materials
109
Instructions
109
Figure 2-47 Catalytic Heater Option in Environmental Enclosure
110
Figure 2-48 Catalytic Heater Assemblies
110
Figure 2-49 Thermostat Assembly Installed
111
Figure 2-50 Regulator and Filter/Drain Assembly Installed
111
Figure 2-51 Temperature Probe Installation
112
ENC82S Optional Catalytic Heater Installation
113
Materials
113
Figure 2-52 Electrical Pre-Heater Wiring Instructions
113
Instructions
114
Figure 2-53 ENC82S Filter/Drain Assembly Installation
114
ENC82 Optional Electric Heater Installation
115
Materials
115
Figure 2-54 ENC82S Catalytic Heater Pre-Heat Wiring
115
Instructions
116
Figure 2-55 ENC82L Electric Heater Installed in Enclosure
116
Figure 2-56 ENC82S Electric Heater Installed in Enclosure
116
Sealing Environmental Enclosure
117
Figure 2-57 ENC82L Electric Heater Option Wiring Instructions
117
Figure 2-58 ENC82S Electric Heater Option Wiring Instructions
117
Customer Supplied Materials
118
Instructions
118
Optional Equipment Enclosure Installation
118
6200 Enclosure
118
6800 Enclosure
119
Location
119
Pipe-Mount Instructions
119
Figure 2-59 6200 Enclosure Pipe-Mounting Installation
120
Figure 2-60 6700 Enclosure Pipe-Mounting Installation
120
Wall-Mount Instructions
122
Figure 2-61 6800 Enclosure Pipe-Mounting Installation
122
Figure 2-62 6200 Enclosure Wall-Mounted Installation
123
Figure 2-63 6700 Enclosure Wall-Mounted Installation
123
115/230 Vac UPS Power Pack (24 VDC Systems)
125
Instructions
125
Figure 2-64 6800 Enclosure Wall-Mounted Installation
125
115/230 Vac to 12 VDC Explosion-Proof Power Supply Installation
126
Customer Supplied Materials
126
Figure 2-65 115/230 Vac UPS Power Pack Option
126
Instructions
127
Figure 2-66 Explosion-Proof AC Power Supply Top/Front Dimensions
127
Figure 2-67 Explosion-Proof AC Power Supply Side Dimensions
127
110/240 Vac to 12/24 VDC Power Supply Installation
128
Figure 2-68 Explosion-Proof AC Power Supply Wiring Instructions
128
Figure 2-69 6200 Optional Equipment Enclosure with Power Supply
129
Figure 2-70 6700 Optional Equipment Enclosure Unit with Power Supply
129
Instructions
130
Battery Pack Installation
130
Figure 2-71 AC/DC Converter Wiring Instructions
130
Figure 2-72 Optional 6800 Enclosure with Battery Pack
131
Figure 2-73 24 VDC Dual Battery Pack Cable
131
Instructions
131
Solar Panel Power Pack
134
Instructions
134
Figure 2-74 Battery Pack with DC Power Supply Wiring Instructions
134
Figure 2-75 12 VDC Battery Pack/Solar Panel Wiring Instructions
135
DC Power Installation
136
Instructions
136
Figure 2-76 24 VDC Battery Pack/Solar Panel Wiring Instructions
136
Remote Communication Installation
137
Table 2-2 Port 1 and Port 2 Pin-Outs/Terminations
137
3 Pgc1000 Start up
139
PCCU32 Installation and Set up
139
Software Installation
139
Ethernet Installation and Set up
140
Figure 3-1 Ethernet Connections
140
Figure 3-2 Ethernet Cable-Typical
141
TCP/IP Network Connection
141
Figure 3-3 Ethernet Cross-Over Cable
142
TCP/IP Local Connection
142
Connecting to the Pgc1000'S Local Port
143
Instructions
143
PGC1000 Diagnostics
144
Figure 3-4 MMI Communication Cables
144
Security System Setup
145
Hardware Security
145
PCCU Security
145
Role Based Access Control (RBAC)
146
Alarm Definitions
146
Table 3-1 Defaulted Alarm Definitions
146
4 Maintenance
149
Overview
149
Help
149
Maintaining Cleanliness
149
Returning Part(S) for Repair
149
Spare Part Components
150
Replacement Components
150
Replacement Parts
150
Figure 4-1 PGC1000 Overall View
152
Figure 4-2 Analytical Module View, Exploded
153
Figure 4-3 Feed-Through Assembly
153
Repair Time
154
Recommended Spares
154
Customer Service
154
Table 4-1 Repair Time Vs. down Time
154
Field Tool Kit
155
Table 4-2 Recommended Spare Parts
155
Table 4-3 Tool Requirements
155
Visual Inspection
156
Inspection
156
Backing up Configuration Files (Save)
156
Instructions
156
Restore Configuration Files
157
Instructions
157
Reset Procedures
157
Warm Start Instructions
157
Cold Start Instructions
158
Restore Factory Defaults
159
Figure 4-4 Digital Controller Complete Assembly
159
Instructions
160
Lithium Battery Status
160
Changing the PGC1000 Clock
160
Clock Change Not Crossing a Log Period Boundary
161
Forward Clock Change Crossing a Log Period Boundary
161
Backward Clock Change Crossing a Log Period Boundary
161
Replacing Calibration or Carrier Gas Bottle(S)
161
Instructions
162
Removing Digital Controller Assembly
162
Instructions
163
Replacing Digital Controller Complete Assembly
163
Figure 4-5 Digital Controller Board
163
Replacing Analytical Module
164
Instructions
165
Figure 4-6 Analytical Module
166
Figure 4-7 Analytical Processor Board
166
Replacing GC Module
167
Instructions
168
Figure 4-8 GC Module, Exploded View
169
Replacing Termination Board
170
Instructions
170
Replacing Feed-Through Assembly
171
Figure 4-9 Termination Board
171
Instructions
172
Figure 4-10 Feed-Through Assembly
173
Replacing Lithium Battery
174
Instructions
174
Replacing Frit Filters
175
Instructions
175
Figure 4-11 Primary Component Side Digital Controller Board
175
Figure 4-12 Feed-Through Assembly - Exploded View
176
Replacing Feed-Through Interface Gasket
177
Instructions
177
Replacing Feed-Through Manifold Gasket
177
Instructions
178
Replacing Termination Board to the Digital Controller Cable
179
Instructions
179
Replacing Analytical Processor to the Termination Board Cable
181
Instructions
181
5 Troubleshooting
183
Overview
183
Troubleshooting Support
183
Getting Started
183
Start-Up Diagnostic Troubleshooting
184
Figure 5-1 Troubleshooting Flowchart
184
Carrier Pressure Regulator Test
185
Oven Temperature Test
185
Status
185
Processor Control Test
187
Stream Test
188
Troubleshooting Alarms
189
Table 5-1 PGC1000 Alarms
189
Alarm Severity
190
Operators
190
Pressure Regulator Alarm
190
Sample Pressure Alarm
192
No Stream Valve Selected Alarm
193
Oven Temperature Error Alarm
193
Digital-Analog Board Communication Error Alarm
194
Calculation Error Alarm
195
Calibration Un-Normalized Error Alarm
195
Stream Sequence Error Alarm
196
Calibration CV Percent Error Alarm
197
Calibration RF Percent Error Alarm
197
Enclosure Temperature Alarm
198
Low Carrier Gas Bottle (DI1) Alarm
199
Power Supply Alarm
199
GCM Processing Error Alarm
200
Low Cal Gas Bottle (DI2) Alarm
200
Bad Bead Alarm
201
No Pilot Valve Charge Detected Alarm
201
Sample Flow Detection Alarm
201
CPU Loading Alarm
202
System Memory Available Alarm
202
FLASH File Available Alarm
203
Missing Peak-Calibration Not Used
203
RAM File Available Alarm
203
Stream Un-Normalized Total
204
Alarm Troubleshooting Tests
205
Sample Vent Pressure Test
205
Column Vent Pressure Test
205
Sample Pressure Test
206
Feed-Through Assembly Blockage Test
206
Temperature Sensor Test
206
Abnormal Calibration Gas Depletion
207
Power Troubleshooting
207
Overview
207
Power Supply Voltage Test
208
Figure 5-2 Power Troubleshooting Flowchart
208
Equipment Isolation Test
209
PGC1000 Module Isolation Test
210
Charger Circuit Test
211
Solar Panel Troubleshooting Test
211
AC Charger/Power Supply Troubleshooting Test
211
Table 5-2 Specifications for Solar Panels
212
Figure 5-3 Solar Panel Wiring Instructions
213
Troubleshooting Communications
214
Overview
214
Figure 5-4 AC Charger/Power Supply Wiring
214
Communication
215
Figure 5-5 Communication Troubleshooting Flowchart
216
Transceiver Supply Voltage Test
217
VDC Communications Supply Voltage
217
Transceiver Check
217
Communication Test
218
Table 5-3 RS-232 Field Wiring on PGC1000 Termination Board
218
Communication Test
219
Table 5-4 RS-485 Terminations
219
Table 5-5 RS-485 Field Wiring on PGC1000 Termination Board
220
6 Special Applications
221
Introduction
221
Table 6-1 Column Train Listing
221
Table 6-2 Component Listing
222
Using the Special Applications Section
222
General Manual Peak Find Procedure
223
Purpose
223
PCCU32 and the User-Interface
223
Figure 6-1 PGC1000 Operations Screen
224
Table 6-3 Analyzer Operation Screen Functionality
224
Before Starting - Save and Restore
225
Figure 6-2 PGC1000 Cold Boot Via PCCU32 and the 32-Bit Loader
226
General Setup Checklist (Per PGC1000 Start-Up Guide)
227
Figure 6-3 Save and Restore Tfcold and Tfdata
227
Generic Manual Peak Find
228
Figure 6-4 Manual Peak Find Dialog Screen
229
Figure 6-5 Parameter Columns
229
Figure 6-6 Failure to Define a Front Gate
230
Figure 6-7 a Successful Front Gate Determination
231
Figure 6-8 Double Peak Chromatogram
231
Figure 6-9 Manual Peak Find Screen Physical Parameters
232
Table 6-4 Manual Peak Find Parameters
232
Generic Manual Peak Find Procedure
234
Figure 6-10 Column Data Example
234
Table 6-5 Three Methods for Gating the Components of Interest
235
Figure 6-11 Peak Gating Methods
236
Figure 6-12 Manual Peak Find Setup Screen
236
Figure 6-13 Example of a C9+ Chromatogram
237
Figure 6-14 Manual Peak Find Setup Screen
238
Figure 6-15 Run Cycle Chromatogram
239
Figure 6-16 Actual Chromatogram
240
Figure 6-17 Chrom-1 Reference
241
Figure 6-18 Auto Peak Gating of the Three Pentanes
243
Calibration Procedure
244
Figure 6-19 Example of a C9+ Chromatogram
244
Last Words
246
PGC1000 Available Accessories
246
Figure 6-20 Typical Calibration Setup for a C6+ Application
246
7 Application Column Train Definitions
249
BBC (C3+, Air to Acetylene)
250
Table 7-1 BBC Column Train Data Sheet (C3+, Air to Acetylene)
250
Table 7-2 BBC Blend
252
Table 7-3 BBC Column - Data for Manual Peak Find
252
Figure 7-1 BBC Helium Reference Chromatogram
253
BBD (C3+, Air or Acetylene W/H2S & H2O)
254
Table 7-4 BBD Column Train Data Sheet (C3+, Air or Acetylene W/H2S & H2O)
254
Table 7-5 BBD Column - Data for Manual Peak Find
256
BBF (C3+ to Air C2)
257
Table 7-6 BBF Column Train Data Sheet (C3+ to Air C2)
257
Table 7-7 BBF Blend
259
Table 7-8 BBF Column - Data for Manual Peak Find
259
Figure 7-2 BBF Helium Reference Chromatogram
260
BBG (C3+ to Air, C2, 360Sec, H20 and H2S)
261
Table 7-9 BBG Column Train Data Sheet (C3+ to Air, C2, 360Sec, H2O and H2S)
261
Table 7-10 BBG Column - Data for Manual Peak Find
262
BBH (C1+ to H2 or He to CO)
263
Table 7-11 BBH Column Train Data Sheet (C1+ to H2 or He to CO)
263
Table 7-12 BBH Blend
264
Table 7-13 BBH Column - Data for Manual Peak Find
265
Figure 7-3 BBH Helium Reference Chromatogram
266
BBJ (C5+, C3 through C4 Olefins)
267
Table 7-14 BBJ Column Train Data Sheet (C5+, C3 through C4 Olefins)
267
Table 7-15 BBJ Blend
269
Table 7-16 BBJ Column - Data for Manual Peak Find
269
Figure 7-4 BBJ Helium Reference Chromatogram
271
BBK (C6+ to C3, 240 Secs)
272
Table 7-17 BBK Column Train Data Sheet (C6+ to C3, 240 Secs)
272
Table 7-18 BBK Blend
274
Table 7-19 BBK Column - Data for Manual Peak Find
274
Figure 7-5 BBK Helium Reference Chromatogram
275
BBM (C3 to C6+ W/H2S)
276
Table 7-20 BBM Column Train Data Sheet (C3 to C6+ W/H2S)
276
Table 7-21 BBM Blend
278
Table 7-22 BBM Column - Data for Manual Peak Find
278
Figure 7-6 BBM Helium Reference Chromatogram
280
BBR (H2S in Fuel Gas)
281
Table 7-23 BBR Column Train Data Sheet (H2S in Fuel Gas)
281
Table 7-24 BBR Column - Data for Manual Peak Find
283
Figure 7-7 BBR Helium Reference Chromatogram
284
BBS (C3 to C7)
285
Table 7-25 BBS Column Train Data Sheet (C3 to C7)
285
Table 7-26 BBS Blend
287
Table 7-27 BBS Column - Data for Manual Peak Find
288
Figure 7-8 BBS Helium Reference Chromatogram
289
BBT (C9+, C6S to C8S)
290
Table 7-28 BBT Column Train Data Sheet (C9+, C6S to C8S)
290
Table 7-29 BBT Blend
292
Table 7-30 BBT Column - Data for Manual Peak Find
293
Figure 7-9 BBT Reference Chromatogram
294
BBX (C4+, Cyc3, PD, MA) High Range
295
Table 7-31 BBX Column Train Data Sheet (C4+, Cyc3, PD, MA) High Range
295
Table 7-32 BBX Column - Data for Manual Peak Find (High Range)
297
Figure 7-10 BBX Hydrogen Reference Chromatogram
298
BCB (C3+, Air to C2 W/ H2S and H20)
299
Table 7-33 BCB Column Train Data Sheet (C3+, Air to C2W/H2S&H2O)
299
Table 7-34 BCB Blend
301
Table 7-35 BCB Column - Data for Manual Peak Find
301
Figure 7-11 BCB Helium Reference Chromatogram
303
BCC (C6+ to C3, 120 Sec, He)
304
Table 7-36 BCC Column Train Data Sheet (C6+ to C3, 120Sec, He)
304
Table 7-37 BCC Blend
305
Table 7-38 BCC Column - Data for Manual Peak Find
305
Figure 7-12 BCC Helium Reference Chromatogram
306
BCD (C6+ to C3, 90Sec, H2)
307
Table 7-39 BCD Column Train Data Sheet (C6+ to C3, 90Sec, H2)
307
Table 7-40 BCD Blend
308
Table 7-41 BCD Column - Data for Manual Peak Find
308
Figure 7-13 BCD Hydrogen Reference Chromatogram
309
BCF (C3+ to Air, 90Sec, H2)
310
Table 7-42 BCF Column Train Data Sheet (C3+ to Air, 90Sec, H2)
310
Table 7-43 BCF Blend
311
Table 7-44 BCF Column - Data for Manual Peak Find
311
Figure 7-14 BCF Hydrogen Reference Chromatogram
312
BCG (C3+ to Air, C2, 120Sec, He)
313
Table 7-45 BCG Column Train Data Sheet (C3+ to Air, C2, 120Sec, He)
313
Table 7-46 BCG Blend
314
Table 7-47 BCG Column - Data for Manual Peak Find
314
Figure 7-15 BCG Reference Chromatogram
315
BCH (C7+, C3 W/H2S Meas to C6)
316
Table 7-48 BCH Column Train Data Sheet (C7+, C3 W/H2S Meas to C6)
316
Table 7-49 BCH Column - Data for Manual Peak Find
318
Figure 7-16 BCH Helium Reference Chromatogram
320
BCM (H2S 0-30 Ppm)
321
Table 7-50 BCM Column Train Data Sheet (H2S 0-30 Ppm)
321
Table 7-51 BCM Blend
323
Table 7-52 BCM Column - Data for Manual Peak Find
323
Figure 7-17 BCM Helium Reference Chromatogram
325
BBP (30-2000 Ppm O2 W/N2 & HCS)
326
Table 7-53 BBP Column Train Data Sheet (30-2000 Ppm O2 W/N2 & HCS)
326
Table 7-54 BBP Blend
327
Table 7-55 BBP Column - Data for Manual Peak Find
328
BBW (0-30 Ppm O2 W/N2 & HCS)
329
Figure 7-18 BBP Helium Reference Chromatogram
329
Table 7-56 BBW Column Train Data Sheet (0-30 Ppm O2 W/N2 & HCS)
330
Table 7-57 BBW Blend
331
Table 7-58 BBW Column - Data for Manual Peak Find
332
Figure 7-19 BBW Helium Reference Chromatogram
333
Appendix Amodbus ® Registers
335
Advertisement
ABB PGC1000 User Manual (137 pages)
Gas Chromatograph
Brand:
ABB
| Category:
Measuring Instruments
| Size: 6.8 MB
Table of Contents
Table of Contents
2
Contents
2
List of Tables
6
Additional Information
7
Compliance
7
Cyber Security
7
Table 0-1: Related Documentation
7
Malware Prevention
8
Waste Electrical and Electronic Equipment (WEEE)
8
Safety
8
Potential Safety Hazards
9
Product Description
10
Overview
10
System Components
10
Principle of Operation: Sample Processing
11
Hardware Description
11
Table 2-1: Analyzer Specifications
11
Analyzer Standard Hardware Features
12
Cast Aluminum Enclosure
13
Exterior Enclosure Dimensions
14
Feed-Through Assembly
16
Configurations
16
Inlets
16
Vents
16
Analytical Module
16
GC Module
17
Analytical Processor/Manifold Assembly
17
Digital Controller Assembly with VGA Display
18
Termination Board
21
Local Communication Options
22
Embedded Software and User Interface
22
Embedded Software
22
User Interface (PCCU32)
22
Audit Quality Data
22
Compressibility Options
23
Calculation Options
23
Engineering Units
23
Supported Communication Protocols
23
Security
24
Installation
24
Plan for Installation
25
Unpack and Inspect
25
Analyzer Installation
25
Pipe Installation for Stand-Alone Mounting
25
Pipe Saddle Installation for Pipe Saddle Mounting
26
Shelf Installation
26
Analyzer Installation
27
Sample System Installation
28
Sample System Design Considerations
28
Tube Quality
28
Maintaining Phase
29
Sample Probe Installation
29
Sample Conditioning Modules
30
Table 4-1: Sample Conditioning Module Descriptions
31
Sample Line Connections
34
Carrier and Calibration System Installation
36
Calibration/Validation Stream
36
Cylinder Rack Installation on Meter Run
36
Carrier Gas Regulator Installation
36
Table 4-2: Calibration Gas Blend Recommended Components
36
Calibration Gas Regulator Installation
37
Carrier Gas and Calibration Gas Line Connections
39
Vent Lines Connections
40
Security Seal
41
Wiring
42
Wire for Serial Communication
42
Wire for Power and Grounding
42
Table 5-1: Serial Port 1 and Port 2 Pinouts and Terminations
42
Power Supply Requirements
43
Operating Voltages and Cable Lengths
43
Other Considerations
44
Ground the Analyzer
44
Cathodic Protection
44
Wire the Analyzer Power Connector
44
Table 5-2: 12 VDC Battery Power Supply System Maximum Cable Lengths
44
Startup
45
Download PCCU32 from the ABB Website
45
Install PCCU32
47
Establish Initial Local Communication
48
Connect Using USB Port (Standard)
48
Table 6-1: Cable for USB Connection
49
Connect Using RS-232 Port
50
Table 6-2: Required Cables for Connection with MMI Port
51
Connect Using Ethernet Port
52
Table 6-3: Ethernet Cabling for Local Connection
53
Power on Sequence
55
Initialization
55
Startup Diagnostics
55
Startup Wizard
57
Set up the Station
59
Set up the Stream
59
Table 6-4: Station Setup Basic Parameters
59
Table 6-5: Stream Setup Screens
60
Set up Calibration
61
View Diagnostics
62
Update Configuration
63
Analyze the Calibration Stream
64
Enable/Disable Streams
66
Run Analysis Process Streams
67
Complete Startup
68
Manual Peak Find
69
Troubleshoot Peak Find
73
Table 6-6: Peak Find Troubleshooting
73
Table 6-7: Suggested Carrier Pressure Setpoint Adjustment Values
74
Calibrate the Analyzer
75
Verify Calibration Data Using Peak Find
78
Configure for Network Connection
79
Basic Topology
79
IP Addressing
80
Cabling for Connection to Network
80
Table 8-1: Ethernet Cabling for Network Connection
80
Enable Ethernet and Configure IP Parameters
81
Verify Network Connection
83
Basic Ethernet Connection Troubleshooting
84
Configure Security
84
Configure Bi-Level Security
85
Table 9-1: Security Guidelines
85
Table 9-2: Bi-Level Security
85
Configure Role Base Access Control (RBAC)
88
Default Access Roles
90
Set up and Create a New RBAC Security Control File
91
Create the Administrator Account
91
Create Additional User Accounts with Standard Roles
93
Save RBAC Configuration File
94
Save Security Configuration on the Device
95
Maintenance
97
Maintaining Cleanliness
97
Visual Inspection
97
Technical Support and Returns
98
Spare Part Components
98
Replacement Components
98
Replacement Parts
98
Spare Parts
100
Field Tool Kit
100
Table 10-1: Spare Parts
100
Back up Configuration Files
101
Update Embedded Software
101
Table 10-2: Field Tools
101
Restore Configuration Files
104
Reset Procedures
105
Warm Start
105
Cold Start
106
Restore Factory Defaults
107
Lithium Battery Status
108
Change the Clock
108
Clock Change Not Crossing a Log Period Boundary
108
Forward Clock Change Crossing a Log Period Boundary
108
Backward Clock Change Crossing a Log Period Boundary
109
Replace Calibration or Carrier Gas Cylinder(S)
109
Replace the Digital Controller Assembly
109
Replace the Digital Controller Complete Assembly
110
Replace the Analytical Module
111
Replace the GC Module
113
Replace the Termination Panel
114
Replace the Feed-Through Assembly
116
Replace the Lithium Battery
117
Replace Frit Filters
118
Replace the Feed-Through Interface Gasket
119
Replace the Feed-Through Manifold Gasket
120
Replace the Termination Panel to the Digital Controller Cable
121
Replace the Analytical Processor to the Termination Panel Cable
122
Troubleshooting
123
Startup Diagnostics Troubleshooting
123
Carrier Pressure Regulator Test
123
Table 11-1: Startup Diagnostics
123
Table 11-2: Carrier Pressure Regulator Diagnostics
123
Oven Temperature Test
124
Processor Control Test
124
Stream Test
124
Table 11-3: Stream Test Diagnostics
124
Troubleshooting Alarms
125
Table 11-4: Default Alarms
125
Table 11-5: Alarm Severity
125
Alarm Definitions
126
Pressure Regulator 1 or 2 Alarm
126
Table 11-6: Default Alarm Definitions
126
Sample Pressure Alarm
127
Oven Temperature Error Alarm
127
No Stream Valve Selected
127
Digital-Analog Board Communication Error Alarm
128
Calculation Error Alarm
128
Calibration Un-Normalized Error Alarm
128
Stream Sequence Error Alarm
128
Calibration CV Percent Error Alarm
128
Calibration RF Percent Error Alarm
129
Enclosure Temperature Alarm
129
Power Supply Alarm
129
Low Carrier Gas Cylinder (DI1) Alarm
130
Low Cal Gas Cylinder (DI2) Alarm
130
GCM Processing Error Alarm
130
Bad Bead Alarm
130
No Pilot Valve Change Detected Alarm
130
Sample Flow Detection Alarm
130
CPU Loading Alarm
131
System Memory Available Alarm
131
RAM File Available Alarm
131
FLASH File Available Alarm
131
Missing Peak - Calibration Not Used
131
Stream Un-Normalized Total
132
Alarm Troubleshooting Tests
132
Column Vent Pressure Test
132
Sample Pressure Test
132
Feed-Through Assembly Blockage Test
133
Temperature Sensor Test
133
Abnormal Calibration Gas Depletion
133
Power Troubleshooting
133
Overview
133
Power Supply Voltage Test
133
Equipment Isolation Test
134
Analyzer Module Isolation Test
134
Serial Communications Troubleshooting
135
Communication
135
Communications Test
135
Table 11-7: RS-232 Field Wiring on Analyzer Termination Panel
135
Table 11-8: RS-485 Terminations
135
Table 11-9: RS-485 Pinouts (on Termination Panel)
135
ABB PGC1000 Quick Start Manual (2 pages)
Brand:
ABB
| Category:
Measuring Instruments
| Size: 0.26 MB
Advertisement
Advertisement
Related Products
ABB ProcessMaster 300
ABB PFCL 201
ABB PFEA 111
ABB PFEA 112
ABB PFEA 113
ABB PLMU Series
ABB PLM Series
ABB PLS Series
ABB ProcessMaster
ABB PGC5000 Series
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL