hit counter script
Siemens SICHARGE CC AC22 ERK Operating Instructions Manual

Siemens SICHARGE CC AC22 ERK Operating Instructions Manual

Hide thumbs Also See for SICHARGE CC AC22 ERK:

Advertisement

Quick Links

Advertisement

Table of Contents
loading

Summary of Contents for Siemens SICHARGE CC AC22 ERK

  • Page 2 Introduction Safety instructions SICHARGE Description Assembly/installation SICHARGE CC AC22 - ERK SICHARGE Operating instructions, Connecting and commissioning Operation Operating Instructions Malfunctions Maintenance and service Adhesive surfaces Service & Support Disposal Technical specifications Appendix List of abbreviations 07/2020 A5E48571690-AB...
  • Page 3 Note the following: WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems.
  • Page 4: Table Of Contents

    Table of contents Introduction ............................6 Purpose of this documentation .................... 6 Conventions ........................6 Open-source software ......................7 Safety instructions ..........................8 General safety information ....................8 Safe installation and assembly ................... 11 Safety during electrical installation ..................13 Safety during operation .....................
  • Page 5 Diagnostic tests ......................... 91 Software updates ......................97 Adhesive surfaces ..........................98 Adhesive surfaces ......................98 Service & Support ..........................100 10.1 Siemens Industry Support ....................100 Disposal ............................. 101 11.1 Recycling and disposal ..................... 101 Technical specifications ........................102 12.1 Technical specifications ....................
  • Page 6 Table of contents List of abbreviations .......................... 134 Abbreviations ........................134 SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 7: Introduction

    Introduction Purpose of this documentation These operating instructions contain the information required for installing, commissioning, and operating the SICHARGE CC AC22 charging station. The operating instructions contain information on proper use of the charging station. WARNING Failure to comply with the information in these operating instructions may result in the following: •...
  • Page 8: Open-Source Software

    Siemens accepts no liability for the use of the open-source software over and above the intended program sequence, or for any faults caused by modifications to the software.
  • Page 9: Safety Instructions

    Safety instructions General safety information This section contains important, generally valid information on: • Preventing accidents and material damage • Application planning • Mounting and installation • Operation • Maintaining and cleaning the charging station Read this section carefully and follow the safety regulations. This will minimize safety risks. Make your staff and customers aware of this section.
  • Page 10 Safety instructions 2.1 General safety information Target group The sequence of the following safety instructions is based on the use stages of the product life cycle. The description is addressed to the following groups of people: • The operator responsible for the safe operation of the device •...
  • Page 11 Safety instructions 2.1 General safety information Qualified personnel All activities should be performed by qualified personnel. Due to their education, experience and training, such people have knowledge of: • Relevant standards and regulations • Accident prevention guidelines They are authorized to perform the necessary activities and to detect and prevent possible dangers.
  • Page 12: Safe Installation And Assembly

    Safety instructions 2.2 Safe installation and assembly Cleaning Protect the environment and use biodegradable cleaning agents to clean the surfaces. Clean the surfaces of the charging station with a damp cloth. Do not use a steam or water jet for cleaning, because moisture or water may penetrate into the charging station.
  • Page 13 Safety instructions 2.2 Safe installation and assembly Electrical cables There is a risk of electric shock due to exposed electrical connections and components. Before starting the installation work, check that the supply cable has been disconnected from the mains and secured against restart. If damage or tampering is visible, do not commission the charging station.
  • Page 14: Safety During Electrical Installation

    Safety instructions 2.3 Safety during electrical installation Safety during electrical installation Observe the following points for the electrical installation. The electrical connection of the charging station can only be performed by skilled electricians and can only be carried out at zero current.
  • Page 15 Safety instructions 2.3 Safety during electrical installation Damage to sockets and charging cable Inspect sockets and the charging cable for damage on a regular basis. Damaged charging cables endanger safe operation. If you detect damage to the charging cable, do not commission the cable or stop a running charging process.
  • Page 16: Safety During Operation

    Safety instructions 2.4 Safety during operation Safety during operation Observe the following points when operating the charging station, as well as the applicable regional standards and regulations. Failure to follow safety instructions may result in hazardous situations that could cause death or serious injury. Safety at the work site When working on roads, construction sites and in public areas, ensure safety in line with local requirements and regulations.
  • Page 17: Safe Cleaning And Maintenance

    Safety instructions 2.5 Safe cleaning and maintenance Safe cleaning and maintenance Observe the following points for cleaning and maintenance. Electrical equipment may only by cleaned and maintained by qualified personnel. Act according to the safety instructions given. Observe the applicable regional standards and regulations. Failure to follow safety instructions may result in hazardous situations that could cause death or serious injury.
  • Page 18: Security Information

    In order to protect plants, systems, machines, and networks against cyber threats, it is necessary to implement – and continuously maintain – a holistic, state-of-the-art industrial security concept. Siemens’ products and solutions constitute one element of such a concept. Operators of the charging station are responsible for preventing unauthorized access to their plants, systems, machines, and networks.
  • Page 19: Safety-Relevant Symbols

    Safety instructions 2.7 Safety-relevant symbols Safety-relevant symbols Icons for SICHARGE CC AC22 The following table explains icons than may be located on your product, on its packaging, or in the accompanying documentation. Symbol Meaning General warning sign Caution/Notice You must read the product documentation. The product documentation contains information about the type of potential hazard and helps to recognize risks and implement countermeasures.
  • Page 20: Identification Of The Device Erk

    Safety instructions 2.8 Identification of the device ERK Identification of the device ERK The rating plate is attached on the inside of the device door. It contains the device ID, serial number, and key connection data. Information on the nameplate will help service and support with troubleshooting and procuring matching spare parts.
  • Page 21: Description

    Description Application This charging station is a first-class, cutting edge product. You can charge electrically powered vehicles safely and reliably with the SICHARGE CC AC22 charging station. Charging stations can be used for stand-alone operation. They can also be integrated into flexible, modular, and retrofittable infrastructure.
  • Page 22: Charging Station Structure

    Description 3.2 Charging station structure Charging station structure ① Status light ② RFID reader ③ Viewing window for meter ④ Charging connection type 2 ⑤ Pushbutton ⑥ Maintenance door Figure 3-1 Charging station structure SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 23: Charging Module Structure

    Description 3.3 Charging module structure Charging module structure Options and accessories may vary. SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 24: Flowchart

    Description 3.4 Flowchart ① Multiple door lock ② Status light for each charging point ③ Control cabinet fan ④ Charging controller ⑤ Viewing window for meter ⑥ Electronic residential meter ⑦ Charging socket type 2 ⑧ Fuses for charging points ⑨...
  • Page 25: 3.5 Charging Controller

    Description 3.5 Charging controller Charging controller ① Charging point 1, electronic residential meter connection ② Charging point 1 charging module controller (MCB, RCCB, contactor, charging socket type 2, status indicator) ③ Charging point 2, electronic residential meter connection ④ Charging point 2 charging module controller (MCB, RCCB, contactor, charging socket type 2, status indicator) ⑤...
  • Page 26 The SIM card is required for communication e.g. with the backend. The SIM card is not included in the standard delivery of the charging station. If desired, an optional pre-configuration can be carried out at the manufacturer. Contact Siemens branch for more information.
  • Page 27: Covers For Infeed And Charging Modules

    Description 3.6 Covers for infeed and charging modules Note Security seal When trying to remove the label, parts of the hologram and a VOID lettering remain. Reuse or manipulation is thus excluded. Covers for infeed and charging modules Sealable covers protect the charging module and the infeed against tampering. The unit is delivered without seals.
  • Page 28 Description 3.6 Covers for infeed and charging modules ① Sealing of the charging modules by operators ② Cover for charging modules ③ Sealing of the infeed area by the operator ④ Feed cover SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 29: Counter Seal

    Description 3.7 Counter seal Counter seal The seal of the counter serves as access / manufacturer protection. The seal protects counters against tampering or removal. The manufacturer seals the counter using a seal. Only personnel authorized by the manufacturer may open the seals. If you find a damaged seal, take the device out of service and report it immediately to the operator and manufacturer.
  • Page 30: Assembly/Installation

    Assembly/installation Safety measures during assembly General information Charging of electric cars must guarantee high performance over long periods. The installation and pre-installation of the charging station must comply with the power requirements. To ensure that these requirements are fulfilled correctly, these installation instructions are intended for qualified and trained electricians.
  • Page 31: Preparation Before Assembly

    • Prepare and position the concrete foundation according to the "foundation and reinforcement plan" of the respective installation type. – Foundation and reinforcement plan for standard version (https://support.industry.siemens.com/cs/ww/de/view/109780588) – Foundation and reinforcement plan for option: HAK (https://support.industry.siemens.com/cs/ww/de/view/109780588) • Anchor the four segment anchor rods or the mounting plate in the concrete foundation according to the "Foundation and reinforcement plan"...
  • Page 32 Assembly/installation 4.2 Preparation before assembly Required tools The required tools are not included in the scope of delivery. • Combination wrench set up to 19 width across flats • Key for housing (in the accessory kit) • Spirit level • Phillips head screwdriver set •...
  • Page 33: Assembly Procedure

    Assembly/installation 4.3 Assembly procedure Assembly procedure Specific safety measures DANGER Risk of electric shock when moist due to condensed water Before commissioning the charging station, an authorized and qualified electrician must check whether there is moisture in the charging station. Remove even small amounts of condensed water before commissioning.
  • Page 34 Assembly/installation 4.3 Assembly procedure WARNING Risk of accident Risk of accident in limited space. Leave sufficient clearance to surrounding obstacles to avoid collisions and crushing when setting up the charging station. • Ensure that there is sufficient clearance to the surrounding obstacles when setting the load down.
  • Page 35 Assembly/installation 4.3 Assembly procedure Preparing the foundation Check that the foundation is horizontal using a spirit level. ① Cable entry, view from the bottom Figure 4-1 Foundation, base view Figure 4-2 Top view of the foundation The diagram shows an example of a supply line and branch line. SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 36 Note HAK option With the HAK option, the foundation and cable routing are different than shown in this figure. The foundation and reinforcement plan can be found here (https://support.industry.siemens.com/cs/ww/de/view/109780588). ① Drill holes for M12 threaded rods Figure 4-3 Drill picture...
  • Page 37 Assembly/installation 4.3 Assembly procedure WARNING Risk of accident Risk of accident due to an unsecured, moving module. • Do not leave the open charging station unattended. • Place or lay down the charging station and its parts in such a way that the charging station and its parts cannot tip over or fall down.
  • Page 38 Assembly/installation 4.3 Assembly procedure Mounting the charging station onto the concrete foundation 1. Remove the infeed cover. 2. Do not lift the charging station by yourself. 3. Feed the cables through the openings in the base plate. 4. Place the charging station on the mounting plate, drilled holes, or four threaded rods. 5.
  • Page 39 Assembly/installation 4.3 Assembly procedure 10. Mount the sealing plate flush with the mounting plate. Figure 4-4 Cable entry SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 40 Assembly/installation 4.3 Assembly procedure 11. Fill the charging station with base filler up to the black line (e.g. Hager ZAY95075). Figure 4-5 Marking for base filler SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 41 Assembly/installation 4.3 Assembly procedure Sticker with the quick reference guide for charging The charging station is supplied with a sheet of stickers. The stickers describe the procedure for starting and ending the charging. After setting up the charging station, stick the stickers underneath the meter window of each charge point.
  • Page 42: Connecting And Commissioning

    Connecting and commissioning Connecting the supply cable Select the cable cross-section according to load and voltage drop: Note Three-phase operation The charging station may only be operated with 3 phases + N + PE. The specifications can be obtained from the rating plate (Page 19). •...
  • Page 43 Connecting and commissioning 5.1 Connecting the supply cable To connect the supply cable, proceed as follows: 1. Sheath the power supply cable above the strain relief. Make the protective conductor at least 50 mm longer than L and N. 2. Lay the cables in the housing in loops, as shown in the following figure. Figure 5-1 Infeed unit Note...
  • Page 44 The electrical circuit diagram is located in the maintenance door in the document compartment of the SICHARGE charging station. The electrical circuit diagram can be downloaded here (https://support.industry.siemens.com/cs/ww/de/view/109780588). See also Options available for orders (Page 110) SICHARGE Operating instructions, ERK...
  • Page 45: Optional Equipment

    Connecting and commissioning 5.2 Optional equipment Optional equipment Optional equipment ① Last Gasp ② Overvoltage and lightning protection ③ Double terminal Figure 5-2 Order options Last Gasp The Last Gasp function is an option that can be ordered additionally. This option includes an internal add-on module that does the following in the event of a power failure: •...
  • Page 46: Sim Card

    Connecting and commissioning 5.3 SIM card Overvoltage protection If you have ordered the overvoltage protection option, an additional internal add-on module is installed. This module is a 4-pin combination arrester with a remote signaling contact. It limits the follow-on current, displays errors, and outputs a trip notification via OCPP. For technical specifications, see section Options available for orders (Page 110).
  • Page 47 Connecting and commissioning 5.3 SIM card Insert/remove SIM card Follow the instructions below to insert or remove the SIM card: 1. Remove the two screws from the card cover of the charging controller ① Card cover 2. Remove the card cover from the charging controller 3.
  • Page 48: Switching On And Testing

    Connecting and commissioning 5.4 Switching on and testing Switching on and testing Procedure for switching on and checking the charging station. Perform the following steps to switch on the charging station. 1. Switch the power supply on. Switch on the backup fuses, the load breaker switch and the RCCB. 2.
  • Page 49 Connecting and commissioning 5.5 Commissioning Change Password We recommend changing the password during commissioning. Comply with current rules of applicable IT standards for creating and managing secure passwords. NOTICE Manage password Manage the new password carefully. The password cannot be reset or retrieved on site. The password can be reset via the backend.
  • Page 50 Connecting and commissioning 5.5 Commissioning Dashboard The status of the connections is shown in tab "Dashboard". Figure 5-4 Dashboard SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 51 Connecting and commissioning 5.5 Commissioning Network/Interfaces Set the network connection in the "Network/Interfaces" tab. Set the check mark at "Use DHCP" to reach the charging station with a name. Remove the check mark to enter the network settings. For remote maintenance and updates, you must set the check mark for "Enable VPN" and enter the port setting.
  • Page 52 SIM card The SIM card must be operated in a closed APN. Otherwise, SICHARGE AC22 is vulnerable and a sustainable connection cannot be guaranteed. Should you have any questions, contact the relevant Siemens branch. Figure 5-6 Network Mobile SICHARGE Operating instructions, ERK...
  • Page 53 Connecting and commissioning 5.5 Commissioning Network/Proxy Set the proxy connection in the "Network/Proxy" tab. Set the check mark at "Use Proxy" to install the system behind a proxy server. Now, enter the proxy data in these fields. Enter proxy credentials in the "User" and "Password" fields. Figure 5-7 Network Proxy SICHARGE Operating instructions, ERK...
  • Page 54 You do not need to change anything in the "Chargebox ID (Template)" field. If the backend requests the Chargebox ID, enter this separately in the "Chargebox ID (Template)" field. Enter the authorization key provided by the backend in the "Authorization Key" field. Figure 5-8 OCPP Siemens SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 55 Connecting and commissioning 5.5 Commissioning Figure 5-9 OCPP custom SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 56 Connecting and commissioning 5.5 Commissioning Station/Date/Time Set the time zone and the synchronization in the "Station/Date/Time" tab. If you check the "Timezone" box, the time zone of your browser is automatically applied. Clear the check box to select the time zone in the drop-down menu. In the area of "Synchronize date and time via", set the check mark for "NTP"...
  • Page 57 Connecting and commissioning 5.5 Commissioning Station/components Carry out a firmware update in the "Station/components" tab. NOTICE Overwriting firmware Ensure that the charging processes have been completed properly before overwriting the firmware. Figure 5-11 Station Components SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 58 Connecting and commissioning 5.5 Commissioning Station/Connectors The tab "Station/Connectors" has the following items: Points Status Meaning EVSE ✓ Electric Vehicle Supply Equipment ✓ Identification of the charging point Type ✓ Charging point type Hardware ID ✓ Hardware identification number Firmware ✓...
  • Page 59 Connecting and commissioning 5.5 Commissioning Figure 5-12 Station Connectors1 SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 60 Connecting and commissioning 5.5 Commissioning Figure 5-13 Station Connectors2 Station/Power WARNING Entering the maximum current for each outer conductor Only a qualified electrician can make an entry in this field. Enter the maximum available current for each phase in mA for the charging station. The value must not exceed the rated current of the back-up fuse.
  • Page 61 Connecting and commissioning 5.5 Commissioning Setting values: • Min. = 6000 mA • Max. = 63000 mA or rated current of the back-up fuse if the back-up fuse is less than 63 A Pressing the "Save" button saves the entry in the charging station. Use "Reload"...
  • Page 62 Connecting and commissioning 5.5 Commissioning GUI/Branding Set the HMI displays in the "GUI/Branding" tab. Figure 5-15 GUI Branding SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 63 Connecting and commissioning 5.5 Commissioning Language Select the language of the HMI display in the "Language" tab. Figure 5-16 GUI Language SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 64 Connecting and commissioning 5.5 Commissioning Advertisement Set up HMI advertising in the "Advertisement" tab. Select the provider if it does not correspond to the backend. Enter the URL, user and password for the advertisement. Set the update interval for the advertising file in "Data Synchronization". Set the time until advertising begins in "Display Timeout".
  • Page 65 Connecting and commissioning 5.5 Commissioning Authentication Set the authentication in the "User Managment/Authentication" tab. Selection Meaning ? any RFID If recognized, use any RFID. x no RFID Do not use RFID in any check. ✓ a white- Use the whitelist when checking the RFID. listed RFID Figure 5-18 User Management Authentication...
  • Page 66 Connecting and commissioning 5.5 Commissioning Users (RFID Cards) Tab "User Managment/Users (RFID Cards)" provides an overview of customers. In this tab, you can change the status of the customer. Click on the respective icon to change the status of a customer between active / inactive and valid / invalid.
  • Page 67 Connecting and commissioning 5.5 Commissioning Software The "Software" tab displays the currently installed software of the charging station. Figure 5-20 Software Concluding commissioning 1. Disconnect the LAN cable from the charging station. 2. Seal the cover plates. 3. Lock the housing door with the key. 4.
  • Page 68: Operation

    Operation Status indicators Notes on operation The SICHARGE CC AC22 charging station is equipped with status indicators. Different colors and flashing signals indicate the current status of charging points 1 and 2. This signalizes to drivers if the charging station is available and what its status is. The display also directly shows the required information.
  • Page 69 Operation 6.1 Status indicators Status indicators The following table provides an overview of status indicators of charging points: Does not light up If the status indicator does not light up, this indicates an interruption to the power supply. If there is not a power failure, check the backup fuses.
  • Page 70: Main Menu

    Operation 6.2 Main menu Main menu Symbols in the main menu When you switch on the charging station, you will see the following picture on the display. ① Charging station and connection status ② Display of instructions ③ Charging point indicator Figure 6-2 Main menu SICHARGE Operating instructions, ERK...
  • Page 71 Operation 6.2 Main menu Table 6- 1 Symbols of the charging station and connection status Hardware fault Charging point status Charging station reserved Mobile network reception, network strength Mobile reception, data connection (GSM, 2G, 3G, LTE) Connection to the OCPP backend RFID card reader SIM card (controller) Micro SD card...
  • Page 72 Operation 6.2 Main menu Table 6- 2 Symbols of the charging point indicators Charging point number Active meter (value/status) Identification (meter) Vehicle status Plug status Charge point cover Charging status Circuit breaker status Meter status Available power Query to the meter The symbols are explained in the help menu.
  • Page 73: Charging

    Operation 6.3 Charging Charging Safety instructions during the charging process DANGER Risk of electric shock and fire Touching live parts may cause electric shock or even death! Defective connectors or cables may cause fire. • Do not kink or squeeze the charging cable. Do not draw the charging cable over sharp edges or hot surfaces.
  • Page 74 Operation 6.3 Charging Start charging Proceed as follows to start charging: 1. Check if the required charging point is ready for operation: The status LED must light up green. 2. You will see the following instruction on the display: "Press the button below the display and follow the instructions".
  • Page 75 Operation 6.3 Charging Completing the charging Your vehicle is being charged as long as the light pulsates in blue. Charging is complete when the light of the status indicator is constant. You can stop charging at any time. You have three different options for ending the charging process: Procedure with RFID card Proceed as follows to end the charging process with the RFID card: 1.
  • Page 76: Malfunctions

    Malfunctions Fault elimination DANGER Risk of electric shock and fire Touching live parts may cause electric shock or even death! Damaged charging cables and connectors can cause a fire. • The system may only be opened and repaired by the manufacturer, its service department or similarly qualified persons.
  • Page 77: Service Technician Faults

    Malfunctions 7.2 Service technician faults Service technician faults 7.2.1 Meter fault Meter fault message If there is a fault on the meter, the following message is shown on the display. Description Cause Solution The EVSE controller reports an Communication with the meter is dis- Replace the defective meter.
  • Page 78: Ocpp Messages

    Malfunctions 7.2 Service technician faults 7.2.4 OCPP messages Message display The messages displayed on the server (e.g. web interface) may differ from the display messages. This is due to the server setting. Ask the backend provider how to correctly assign the OCPP specified messages/types. Status messages to the backend The various status messages are listed in the following table.
  • Page 79 Malfunctions 7.2 Service technician faults RFID reader Message frame text Charging station ⇒ Backend: ReaderFailure Message frame text Backend ⇒ Charging station: Available Component: Charging station Status LED: No effect Description Cause Solution No RFID reader found RFID reader not plugged in Check wiring/connection to the RFID reader.
  • Page 80 Malfunctions 7.2 Service technician faults Fault: EV connection error Message frame text Charging station ⇒ Backend: EVCommunicationError Message frame text Backend ⇒ Charging station: Faulted Component: Charge point 1 or 2 Status LED: Flashes red 1x Description Cause Solution Connection error to the vehicle Communication with the EV-controller Check wiring/connection to the vehicle.
  • Page 81 Malfunctions 7.2 Service technician faults Circuit breaker fault Message frame text Charging station ⇒ Backend: OverCurrentFailure Message frame text Backend ⇒ Charging station: Faulted Component: Charge point 1 or 2 Status LED: Flashes red 3x Description Cause Solution The main contactor gets stuck. The Replace the main contactor.
  • Page 82 Malfunctions 7.2 Service technician faults Meter fault Message frame text Charging station ⇒ Backend: PowerMeterFailure Message frame text Backend ⇒ Charging station: Faulted Component: Charge point 1 or 2 Status LED: Flashes red 6x Description Cause Solution Meter error The meter is incorrectly wired. Check the wiring.
  • Page 83 Malfunctions 7.2 Service technician faults SD card fault Message frame text Charging station ⇒ Backend: OtherError (RegulatoryComplianceFailure) Message frame text Backend ⇒ Charging station: Faulted Component: Charge point 1 or 2 Status LED: Flashes red 10× Description Cause Solution SD card faulty SD card defective Replace SD card Note:...
  • Page 84: Faqs

    Malfunctions 7.3 FAQs FAQs Frequently Asked Questions (FAQ) The following table shows an excerpt of possible messages. The symbols, their meanings and solutions are described in the three columns. Symbol Meaning Solution Vehicle not connected Connect the charging cable to the vehicle. Check the charging cable.
  • Page 85 Malfunctions 7.3 FAQs Symbol Meaning Solution Vehicle not connected Connect the charging cable to the vehicle and to the charging station. Vehicle connected Status message when you are logged in. (e.g. via smart phone, RFID card, etc.) Select the charging point. Follow the instructions on the display.
  • Page 86 Malfunctions 7.3 FAQs Symbol Meaning Solution 100% of the max. power (22 kW) is available 75% or less of the max. power (22 kW) is available 50% or less of the max. power (22 kW) is available 25% or less of the max. power (22 kW) is available Charging point cover OK Charging point cover open.
  • Page 87 Malfunctions 7.3 FAQs Symbol Meaning Solution The charging station is not con- Check the network connection and the nected to the OCPP server. router setting. Invalid setting of OCPP server Check the OCPP server URLs. The PC has no connection to the Check the cabling.
  • Page 88: Maintenance And Service

    Maintenance and service Cleaning and maintenance Safety measures Note Before cleaning or service work, disconnect the system from the power and ensure it cannot be switched back on. To do this, deactivate at least all fuses to which the charging station is connected.
  • Page 89: Maintenance

    Maintenance and service 8.2 Maintenance Cleaning guidelines • Do not use solvents or corrosive or abrasive detergents. • Use a mild, non-corrosive cleaning agent, e.g. dishwashing detergent, even if heavily soiled. • Wipe the charging station from the outside with a moist cloth and rub the station dry. •...
  • Page 90 Maintenance and service 8.2 Maintenance Inspecting safety devices The charging station has at least one integrated residual current circuit breaker (RCCB) and miniature circuit breaker (MCB). Check all protective devices during commissioning in accordance with the national installation regulations. You can only check the RCCB/MCB combination when the supply voltage is present.
  • Page 91 Maintenance and service 8.2 Maintenance The figure below shows the positions of the fans and filter mats. Figure 8-1 Fans and filter mats NOTICE Electrical hazards The charging station uses 400 V AC supply voltage. Touching live parts may cause electric shock and could be fatal.
  • Page 92: Diagnostic Tests

    Secure the charging station against being switched on again. Only personnel authorized by the operator may break seals of the infeed cover and charging module covers during testing. Only personnel authorized by Siemens may: • Break seals of the meter • Break seals of the SD card •...
  • Page 93 Maintenance and service 8.3 Diagnostic tests Check that the charging station is de-energized. 1. Remove the screws from the meter cover plate. 2. Remove the screws from the meter support plate. Figure 8-2 Mounting the meter 3. Lift the meter. SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 94 Maintenance and service 8.3 Diagnostic tests 4. Turn the meter to the center position. Figure 8-3 Meter charging point left Figure 8-4 Meter charging point right SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 95 Maintenance and service 8.3 Diagnostic tests 5. Remove the seal on the sealing pin. Figure 8-5 Meter seal SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 96 Maintenance and service 8.3 Diagnostic tests 6. Use a screwdriver to unscrew the sealing pin. The sliding lock opens. Figure 8-6 Meter sealing pin 7. Push the meter out of the adapter plate by lightly pressing upwards. Figure 8-7 Remove the meter SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 97 Open and check the data using the Transparenz software. If you remove the SD card, the charging station is not available until you insert the card again. Note SD card type Only use an SD card that is approved by Siemens. SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 98: Software Updates

    8.4 Software updates Software updates Software updates Siemens makes software updates available as part of ongoing feature enhancements and improvements. Check the software version of your system (Page 66) regularly. Keep the software version of your system up-to-date with software updates.
  • Page 99: Adhesive Surfaces

    Adhesive surfaces Adhesive surfaces Marking of adhesive surfaces The hatched areas of the following drawings must not be covered with glue, paint or covered. The supplied quick reference guide is an exception. The quick reference guide is affixed underneath the meter inspection window. Ventilation slots and the maintenance door must not be restricted or obstructed.
  • Page 100 Adhesive surfaces 9.1 Adhesive surfaces Note Option: Full or partial foiling As an option, you can order foiling including adhesive from the factory. SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 101: Service & Support

    • Forums For answers and solutions in all matters of automation technology. • mySupport Your personal working area in Siemens Industry Online Support for notifications, support queries, and configurable documents. This information is provided by Siemens Industry Online Support (https://support.industry.siemens.com/cs/ww/)on the internet.
  • Page 102: Disposal

    Disposal 11.1 Recycling and disposal Disposing of packaging The packaging of the SICHARGE AC22 contains no hazardous substances. Send the packaging for recycling in accordance with the applicable regulations in your country. Disposing of the battery Do not dispose of batteries with household waste. Follow local, national, and international regulations to dispose of the battery.
  • Page 103: Technical Specifications

    Technical specifications 12.1 Technical specifications Performance features and options SICHARGE Designation CC AC22 ● Standard, O available as an option Charge points type 2, 32 A acc. to IEC 62196-1,2 and 61851-1 Connector lock type 2 ● Flap lock type 2 ●...
  • Page 104 Technical specifications 12.1 Technical specifications Technical specifications Designation SICHARGE CC AC22 Display 7" LED Supply voltage AC 400 V ± 10 % 3-phase N+PE Connection frequency 50 Hz Maximum connected power 63 A / phase Load management acc. to maximum infeed; chronological 6 ...
  • Page 105 Technical specifications 12.1 Technical specifications Storage and transport Follow the following framework conditions when storing and transporting the charging station: • The permissible storage temperature of the charging station is -25 to +50 °C. • The permissible air humidity is 5 to 95%, non-condensing. •...
  • Page 106: Appendix

    Appendix Spare parts Spare parts The spare parts listed are available for the charging station. Spare part Article number Weight in kg Calibration law- relevant Display unit SICHARGE FZI:40094.013 Charging socket type 2 SV+KDV FZI:40094.014 Earthed charging socket 16A 230V, type E FZI:40094.015 SICHARGE inspection window FZI:40094.016...
  • Page 107: Installation And Maintenance Schedule

    Appendix A.2 Installation and maintenance schedule Spare part Article number Weight in kg Calibration law- relevant Charging cable with Mode3 charging FZI:40094.060 coupling Bracket for type 2 charging coupling FZI:40094.061 M25 CLICK cable gland FZI:40094.062 0.03 Building junction box, empty (HAK) RAL FZI:40094.063 9006 Foam rubber profile EPDM black 4 m...
  • Page 108 Appendix A.2 Installation and maintenance schedule Action Installa- Commis- Mainte- Duration tion/asse sioning nance in min. mbly Checking • Fault message • Backend connection • SIM card Cleaning (without filter), inside and outside Checking charging sockets and charging cables • Type 2 connector lock •...
  • Page 109: Option: Hak

    Appendix A.3 Option: HAK Option: HAK HAK building junction box The HAK building junction box shown in the illustration is available in the following versions. Table A- 2 HAK versions HAK housing, empty HAK with meter cabinet and building junction The HAK housing is available in various models for the installation of a building junction box and a meter cabinet.
  • Page 110 Appendix A.3 Option: HAK HAK housing, empty The following is set up when ordering a HAK housing without equipment. • Mounting points for meter cabinet and building junction box • Connection cable between the HAK and the charging station HAK housing with meter cabinet and building junction box The following is set up when ordering a HAK housing with a meter cabinet and a building junction box.
  • Page 111: Options Available For Orders

    Appendix A.4 Options available for orders 6. Connect the connecting cable of the SICHARGE charging station in the meter cabinet of the HAK housing. 7. After completing the work, the operator must seal all covers in the HAK and the charging station.
  • Page 112: Overview Of Dimensions Of The Sicharge Cc Ac22 Charging Station

    Appendix A.5 Overview of dimensions of the SICHARGE CC AC22 charging station Overview of dimensions of the SICHARGE CC AC22 charging station Dimension drawing of charging station Figure A-1 Dimension drawing of charging station SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 113 Dimension drawing of charging station with HAK Figure A-2 Dimension drawing of charging station with HAK Foundation and reinforcement plan The foundation and reinforcement plan for the respective version can be found here (https://support.industry.siemens.com/cs/ww/de/view/109780588). SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 114: Information On Weights And Measures Regulations

    Appendix A.6 Information on weights and measures regulations Information on weights and measures regulations Eichrechtliche Hinweise Folgende Hinweise gelten für die Bundesrepublik Deutschland. Am 17. März 2016 trat die Verordnung über technische Mindestanforderungen an den sicheren und interoperablen Aufbau und Betrieb von öffentlich zugänglichen Ladepunkten für Elektromobile (Ladesäulenverordnung - LSV) in Kraft.
  • Page 115 Appendix A.6 Information on weights and measures regulations I Auflagen für den Betreiber der Ladeeinrichtung, die dieser als notwendige Voraussetzung für einen bestimmungsgemäßen Betrieb der Ladeeinrichtung erfüllen muss. Der Betreiber der Ladeeinrichtung ist im Sinne §31 des Mess- und Eichgesetzes der Verwender des Messgerätes.
  • Page 116 Appendix A.6 Information on weights and measures regulations § 33 Anforderungen an das Verwenden von Messwerten (1) Werte für Messgrößen dürfen im geschäftlichen oder amtlichen Verkehr oder bei Messungen im öffentlichen Interesse nur dann angegeben oder verwendet werden, wenn zu ihrer Bestimmung ein Messgerät bestimmungsgemäß...
  • Page 117: Transparency Software

    Appendix A.7 Transparency software 8. Der EMSP muss durch entsprechende Vereinbarungen mit dem Betreiber der Ladeeinrichtung sicherstellen, dass bei diesem die für Abrechnungszwecke genutzten Datenpakete ausreichend lange gespeichert werden, um die zugehörigen Geschäftsvorgänge vollständig abschließen zu können. 9. Der EMSP hat bei begründeter Bedarfsmeldung zum Zwecke der Durchführung von Eichungen, Befundprüfungen und Verwendungsüberwachungsmaßnahmen durch Bereitstellung geeigneter Identifizierungsmittel die Authentifizierung an den von ihm genutzten Exemplaren des zu dieser Betriebsanleitung gehörenden Produktes zu...
  • Page 118 Appendix A.7 Transparency software Login to the provider 1. Open an Internet browser 2. Enter https://certifications.htb.solutions/ in the address line. 3. Click "Enter" 4. Sign in with your credentials Figure A-3 Login SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 119 Appendix A.7 Transparency software Charging stations 1. Select the tab Dashboard 2. Click DETAILS in the field Ladestationen Figure A-4 Charging stations SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 120 Appendix A.7 Transparency software Charging column Click on the data field for the corresponding charging column. Figure A-5 Charging column SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 121 Appendix A.7 Transparency software Charging processes Click the arrow next to DETAILS in the field Ladevorgänge. Figure A-6 Charging processes SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 122 Appendix A.7 Transparency software Selecting the charging process Select the charging process and click on the right of the appropriate field. Figure A-7 Charging process SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 123 Appendix A.7 Transparency software Signed measured values Click the Signierte Messwerte tab. Figure A-8 Signed measured values SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 124 Appendix A.7 Transparency software Downloading the measured values Click on the arrow to download the signed measured values of the charging process. Figure A-9 Download Result The file with the signed measured values in *.xml format, the selected charge process, is stored locally on your device.
  • Page 125: Installation And Operation

    Appendix A.7 Transparency software A.7.2 Installation and operation Installation and setup of the Transparenz software To install and commission the application, proceed as follows: 1. Download the Version of the Transparenz software (https://transparenz.software/) released by PTB to your computer. 2. Extract this file into any folder. 3.
  • Page 126 Appendix A.7 Transparency software 5. You will also find the public key pre-filled in the text box. You can now manipulate the existing data in the text data to, for example, falsify test results. 6. To check the signature, click "Überprüfen". Figure A-10 Open the Transparenz software data record SICHARGE Operating instructions, ERK...
  • Page 127 Appendix A.7 Transparency software Signature verification The result of the signature verification is displayed in a new window. In this signature window, you can see all the information that was contained in the signed data record. Figure A-11 Transparenz software data record result SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 128 Appendix A.7 Transparency software Checking the transaction After having selected the transaction in the overview of the open data records, click "Transaktion überprüfen" to check the transaction. Figure A-12 Check the Transparenz software transaction SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 129 Appendix A.7 Transparency software Result The test result will now also show the difference between the start and the stop meter status. Figure A-13 Transparenz software transaction result SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 130: Implementation

    Appendix A.7 Transparency software A.7.3 Implementation Implementation of the signature conversion If you as the operator would like to check your implementation of the signature conversion, proceed as follows: 1. Copy the signature data and the public key from your signature data record into the corresponding fields in the Transparenz software.
  • Page 131 Appendix A.7 Transparency software Figure A-15 xml sample output SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 132 Appendix A.7 Transparency software Verification of Contract ID in the signed readings Use the RFID card number as the Contract-ID . You can view them in the backend. The card number in this example is CBD676E6. In the Transparenz software, this number can be found under Vertrags-ID or Contract-ID in the details of a measured value reading.
  • Page 133 Appendix A.7 Transparency software This number consists of several bytes. A byte is always written in hexadecimal notation with 2 characters. Bytes 0 - 2 encode the version number of the charging controller firmware as an integer. Position Meaning Byte 0 Major revision Byte 1 Minor revision...
  • Page 134: Quality Documentation

    The EC Declarations of Conformity are kept available for the responsible authorities at: Siemens AG Smart Infrastructure Distribution Systems Mozartstr. 31c 91052 Erlangen, Germany These files are also available for download on the Siemens Industry Online Support (https://support.industry.siemens.com/cs/ww/en/) pages, under "Declaration of Conformity". SICHARGE Operating instructions, ERK Operating Instructions, 07/2020, A5E48571690-AB...
  • Page 135 List of abbreviations Abbreviations Access Point Name Gateway access point Electronic household meter EMSP Electromobility Service Provider Measured value users EVSE Electric Vehicle Supply Equipment Graphical User Interface Graphical user interface RCCB Residual Current Circuit Breaker LVDS Low Voltage Differential Signaling OCPP Open Charge Point Protocol Over Voltage Protection...

Table of Contents