2. Ceiling dimensions and hanging bolt location
I Installation of Unit
Install the unit above the ceiling correctly.
CASE 1
POSITION OF SUSPENSION BOLT
• Apply a joint-canvas between the unit and duct to
absorb unnecessary vibration.
• Apply a filter Accessory at air return hole.
Dimension
A
Capacity
1292
48K BTU
• Install the unit leaning to a drainage hole side as a
figure for easy water drainage.
CASE 2
POSITION OF CONSOLE BOLT
• A place where the unit will be leveled and that can
support the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
Copyright ©2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes
(Unit:mm)
B
C
D
E
1230
650.5
54
680
- 14 -
A
B
Drainage hole
M10 Nut
X 4
(Local
M10 SP. washer
X 4
supply)
M10 washer
X 4
M10 washer
X 4
(Local
M10 SP. washer
X 4
supply)
M10 Nut
X 4
LGE Internal Use Only