hit counter script

Piping Connection; Vacuum Drying - LG LB-E4880HL Service Manual

Ceiling duct air conditioner
Table of Contents

Advertisement

Piping Connection

1. Form the piping according to its routing. Avoid
bending and bending back the same piping point
more than three times. (This will result in harden-
ing the pipe.)
2. After deforming the piping, align centers of the
union fitting of the indoor unit and the piping, and
tighten them firmly with wrenches.
3. Connect pipe to the service valve or ball valve
which is located below the outdoor unit.
4. After completing the piping connection, be sure
to check if there is gas leakage in indoor and
outdoor connection.

Vacuum drying

After completing the piping connection, execute
vacuum drying for the connecting piping and the
indoor unit.
The vacuum drying must be carried out using the
service ports of both the liquid and gas side valves.
Model
Liquid side piping Gas side piping
48K BTU
CAUTION
Use two wrenches and tighten with regular torque.
Pipe size
Liquid Side
Gas Side
Copyright ©2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes
1/2"
3/4"
Torque
3/8"
4.2kg.m
1/2"
5.5kg.m
5/8"
6.6kg.m
3/4"
6.6kg.m
Outdoor
unit
Flare connection
- 20 -
Liquid side
Indoor
unit
Flare connection
Gas side
Union
LGE Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents